USPTO serial 79358025
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Recorded computer software used to create visualizations of multi-dimensional designs in the fields of architecture, construction and landscaping; interactive touch screen terminals; downloadable computer software used to create visualizations of multi-dimensional designs in the fields of architecture, construction and landscaping; data processing equipment; navigation instruments for use in excavator's control and operation; satellite navigation instruments, namely, satellite-aided navigation guidance system for excavator control and operation; navigation apparatus for vehicles in the nature of on-board computers; radio apparatus, namely, radio receivers; cameras for use in recording and monitoring excavator's control and operation; surveying instruments; laser pointers; logs being measuring instruments, namely, electronic data loggers; optical apparatus and instruments, namely, opticallaser receivers and prisms for optics purposes for use in excavator's control and operation; remote control for use in excavator's control and operation; movements measuring sensors for use in excavator operation | ACTIVE | — |
| 042 | Conducting technical project studies, namely, engineering services in the field of construction project studies; engineering; engineering drawing services; computer software design; computer programming; maintenance of computer software; duplication of computer programs; conversion of data or documents from physical to electronic media; cloud computing featuring software for construction working process in the nature of architectural design and drawing; updating of computer software; consultancy in the design and development of computer hardware; rental of computer software for graphic illustration and drawing for architecture, construction, and landscaping purpose; installation of computer software; software as a service (SaaS) services featuring software for graphic illustration and drawing for architecture, construction, and landscaping purpose; cartography services | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 14, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 21, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 21, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 11, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 30, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 30, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 11, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 11, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 7, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 7, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 26, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 26, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 6, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 6, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 21, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 20, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 20, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 20, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 20, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 5, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 5, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 5, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 13, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 24, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 24, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 2, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 1, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 3, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 28, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 26, 2022 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Dec 22, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |