USPTO serial 79358339
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Transformers, switching equipment, namely, electricity switch cabinets, electricity switch boxes, electric control panels, electrical and high voltage reactors, electric stepping switches, on-load tap changers being components of transformers, electrical reactors, capacitances in the nature of capacitors, arc suppression electric coils, electrodes, earthing or discharge devices in the nature cables for earthing and electric discharge tubes, other than for lighting, electric cables, overhead lines in the nature of electric cables; electric apparatus and instruments in the nature of electric meters, calculating machines, electric control panels, voltage regulators, and apparatus and instruments for regulating and controlling electric current and voltage and downloadable or recorded computer programs for the monitoring, testing and control of transformers, circuit breakers, reactors, drives, wind power installations, generators, cables, overhead lines, switch gears, filter circuits, compensating reactors, electric switches, technical, chemical and electric installations, furnishings and apparatus; measuring assemblies in the nature of instruments for measuring temperature, pressure, current, voltage, amperage, wattage, electrical resistance, capacitance, reactive power, dissipation factor, power factor, phase shift and electrical impedance, faraday assemblies in the nature of faraday cages, voltage sources, electric and electronic filters, electric power supply units, voltage regulators, test lab devices and equipment in the nature of equipment for measuring high voltage measurements including measuring AC, DC and impulse voltage and electrical currents, AC test systems consisting primarily of equipment for generating and measuring high voltage AC voltage and electrical currents, high current test systems consisting primarily equipment for measuring high voltage measurements including measuring AC, DC and impulse voltage and electrical currents, DC test system consisting primarily equipment for generating and measuring high voltage DC voltage, surge voltage and surge current test systems consisting primarily of equipment for measuring high voltage measurements including measuring AC, DC and impulse voltage and electrical currents, electric filters in the nature of low pass inductor filter used in high power electrical applications; sensors and measuring devices for measuring temperature, liquid level, fluid flow, speed, acceleration, voltage, bending, expansion, shearing, torsion, pressure, humidity, surface vibrations, sound, vibrations, radiation, light and microwaves not for medical use; sensors and measuring devices for measuring current, voltage, energy, power, impedance, power factor, phase shift, electric loss factor, partial discharge, the analysis of dissolved gases, and the transformation ratio of transformers, not for medical use; oscilloscopes, electronic data loggers, voltage regulators, electrical filters in the nature of low pass inductor filter used in high power electrical applications and electronic filters in the nature of low pass inductor filter used in high power electrical applications, rogowski coils in the nature of electrical transformers, high frequency current transformers, uhf electric sensors, coupling capacitors, not for medical use; computers, computer hardware, downloadable or recorded computer software for conducting, distributing, switching, transforming, accumulating, monitoring influencing or controlling electricity, downloadable or recorded cloud computing software for conducting, distributing, switching, transforming, accumulating, monitoring influencing or controlling electricity and cloud software applications for conducting, distributing, switching, transforming, accumulating, monitoring influencing or controlling electricity, interfaces for computers, communication interface units in the nature of electronic display interfaces, downloadable or recorded computer software for conducting, distributing, switching, transforming, storing, influencing, monitoring and controlling electricity; installations, equipment for conducting, distributing, switching, transforming, accumulating or controlling electricity, namely, electrical conductors, electrical switchers, electrical on load tap-changers, electric tap-changers, electrical power distribution units, electric accumulators, electric control panels, and resistors for distributing or controlling electric current or voltage, downloadable or recorded computer software for influencing, processing, controlling, monitoring, assessing and examining drives, motors, wind power installations, wind farms, generators, cables, switch gears, overhead lines, filter circuits, compensating reactors, electric switches, technical, chemical and electric installations, furnishings and apparatus * ; all the aforesaid goods being solely in the field of high voltage technology * | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 20, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 18, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 7, 2024 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Oct 17, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 12, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 16, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 16, 2024 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| Feb 15, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 15, 2024 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Feb 15, 2024 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jan 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 17, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Oct 24, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 24, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 8, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 8, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 19, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 30, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 27, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 26, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 26, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 29, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 8, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 8, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 12, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 11, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 9, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 31, 2022 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 27, 2022 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 22, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |