Drawing for HIMA SAFETY INSIDE

USPTO serial 79358450

HIMA SAFETY INSIDE

Reviewed by CopyMark Law Group

Reg. 7389994Status 700Registered
Filing date
Status date
Registration date
May 21, 2024
Examiner
EUBANK, REBECCA A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with HIMA SAFETY INSIDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Programmable logic controllers for processing engineering and industrial installations and machines for the industrial and commercial sector; electronic process automation and control systems comprising programmable and non-programmable safety controllers, and comprising related input/output modules and communication modules, and recorded workstation software for safety engineering, all for machines; programmable logic controllers, electrical wires for programmable controllers and memory-programmable controls in the form of electronic chips, programmable electronic control systems controllers for machines, all for use in the industrial and commercial sector, namely, in the process industry, in the rail industry, in medical technology, and in the fields of airport security, logistics and machine safety; electronic automation process control systems comprising programmable and non-programmable safety controllers, and comprising related input/output modules and communication modules, and recorded workstation software for safety engineering, all for machines; programmable logic controllers, electrical wires for programmable controllers and memory-programmable controls in the form of electronic chips, programmable electronic control systems controllers for machines, all for use in the fields of burner regulating systems, pipeline systems, process control systems, sensor and drive technology, and energy generating installations; electronic controllers and electronic control systems comprising programmable and non-programmable safety controllers, and comprising related input/output modules and communication modules, and recorded workstation software for safety engineering, all for operating machines, cable cars, lifts, robots, escalators, passenger services, medical apparatus, railway installations, industrial installations, conveying installations and assembly systems, driverless transport systems, dies and presses, painting installations, robot cells, operating installations in relation to process flows, high-bay storage, sluices and polders, lifting mechanisms and lifting platforms, cranes and crane networks; systems for automation, protection and monitoring comprising programmable logic controllers for the industrial and commercial sector, in particular for machines, process engineering and industrial installations and railway installations; computer hardware and recorded software for controlling and monitoring automated processes in the industrial and commercial sector, the process industry, the railway industry, airport security, logistics and machine safety, intralogistics, medical technology, for burner regulating systems and pipeline and process control systems; downloadable software for controlling and monitoring automated processes in the industrial and commercial sector, namely, in the process industry, in the railway industry, and in the fields of intralogistics, logistics and machine safety, sensor systems, actuator and drive technology, airport security, medical technology, burner regulating systems, pipeline and process control systems, energy generating installations and wind power installationsACTIVE
042Research and development of new technology in the field of automation controllers, and product development of programmable logic controllers in the form of electronic chips and software relating thereto for the industrial and commercial sector, the process industry, the railway industry, and in the fields of medical technology, intralogistics, logistics and machine safety, airport security, the fields of sensor and actuator systems and drive systems, burner regulating systems, pipeline and process control systems and energy generating installations; Product development of automation, protection and monitoring systems for machines, process engineering and industrial installations and railway installations; technological consulting services in the field of industrial and commercial automation tasks; development of software for programming of controls in the industrial and commercial sector, namely, the process industry, the railway industry, airport security, and in the field of intralogistics, logistics and machine safety, machine technology, burner regulating systems, pipeline and process control systems, sensor systems, energy generating installations and wind power installationsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 30, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Nov 9, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Nov 9, 2024FIMPFINAL DISPOSITION PROCESSED
Aug 21, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 21, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
May 21, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 5, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Mar 5, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 4, 2024GPNXNOTIFICATION PROCESSED BY IB
Feb 14, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 14, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 14, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Feb 14, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jan 2, 2024PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Dec 19, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 19, 2023XAECEXAMINER'S AMENDMENT ENTERED
Dec 19, 2023GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 19, 2023GNEAEXAMINERS AMENDMENT E-MAILED
Dec 19, 2023CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 15, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 15, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 15, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 26, 2023RFNPREFUSAL PROCESSED BY IB
Jun 7, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 6, 2023RFRRREFUSAL PROCESSED BY MPU
Apr 21, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 12, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 11, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 6, 2023DOCKASSIGNED TO EXAMINER
Dec 31, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Dec 27, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 23, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance