Drawing for S

USPTO serial 79358671

S

Reviewed by CopyMark Law Group

Reg. 7838790Status 700Registered
Filing date
Status date
Registration date
Jun 24, 2025
Examiner
KRUSSMAN, IAN GEORGE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with S?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction of wave-operated energy power plants; construction of energy infrastructure in the field of renewable energies, in particular in connection with wave, wind and solar power plants; installation of electrical energy installations for renewable energies, in particular in connection with wave, wind and solar power plants; repair and maintenance of energy generating installations and energy generating machines, in particular, in relation to the fields of wave power plants, wind based power plants, and solar power plants; repair and maintenance of energy supply installations and machines, in particular in connection with wave, wind and solar power plants; installation, repair and maintenance of floating platforms, in particular having photovoltaic modules, wind-power installations and floating platforms equipped with wave energy conversion modules; installation of floating maintenance and supply platforms; installation of floating transport, goods and storage platforms; installation of floating platforms holding electronic and information technology (IT) components, in particular hardware components and devices for data processing and data exchange; installation of mooring and leisure platforms for mooring boatsACTIVE
042Scientific research relating to energy, in particular, natural and renewable energy sources; conducting of scientific research and technical project studies in the field of using natural and renewable energy sources for electric energy supply; design and development of systems for generating electrical energy and renewable and natural energy sources; design and development of energy management software; data recording and data evaluation services relating to energy consumption; consultancy in the field of energy-saving; advisory services relating to the use of energy; advisory services relating to energy efficiency; consultancy relating to technological services in the field of power and energy supply; provision of information concerning scientific research and technical project studies relating to the use of natural energy; energy auditing; creation of software programs for the energy industry; technological consultancy relating to the conservation of energy; technological consultancy relating to energy efficiency in buildings; providing technical advice relating to energy-saving measuresACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 5, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jan 20, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB
Jan 20, 2026FIMPFINAL DISPOSITION PROCESSED
Sep 24, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jun 24, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jun 24, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 6, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 6, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 30, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 8, 2025PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Mar 19, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 18, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 18, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 18, 2025ALIEASSIGNED TO LIE
Jun 30, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jun 14, 2024ALIEASSIGNED TO LIE
Jun 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 7, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 28, 2024NREVNOTICE OF REVIVAL - E-MAILED
Feb 28, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 28, 2024PETGPETITION TO REVIVE-GRANTED
Feb 28, 2024PROATEAS PETITION TO REVIVE RECEIVED
Jan 22, 2024MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 22, 2024MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jan 22, 2024ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jul 11, 2023RFNTREFUSAL PROCESSED BY IB
Jun 19, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jun 19, 2023RFRRREFUSAL PROCESSED BY MPU
May 13, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 12, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 12, 2023DOCKASSIGNED TO EXAMINER
Dec 31, 2022MAFRAPPLICATION FILING RECEIPT MAILED
Dec 27, 2022NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 23, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance