Drawing for UBY

USPTO serial 79358766

UBY

Reviewed by CopyMark Law Group

Reg. 7490560Status 700Registered
Filing date
Status date
Registration date
Sep 3, 2024
Examiner
SEVERSON, JUSTIN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with UBY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Measuring apparatus, namely instruments for measuring sounds, vibrations, air quality, water quality, power consumption and movement and analyzing the data; measuring sensors, namely, optical, sound, vibration, mobility, air quality, water quality and energy consumption sensors; recorded or downloadable software for testing, monitoring, identifying, locating, alerting and analyzing data relating to environmental impact, safety, productivity, asset management and sustainability in the construction field; recorded or downloadable computer software platforms for data collection and data analysis; all these goods for use in collecting and analyzing data relating to environmental impact, safety, productivity, asset management and sustainability in the construction fieldACTIVE
035Compilation of statistics; collection and computerized data processing relating to the mastering of environmental impact, safety, productivity, asset management and sustainability challenges in the construction field; assistance relating to data processing; business advisory services for companies with respect to data processing; all these services for use in mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction fieldACTIVE
038Telecommunication access services; communication services, namely, electronic transmission of data and documents among users of computers; Transmission of information by electronic communication networks; data communication services, namely, transmission of voice audio and data via mobile telecommunications and global computer networks; all these services for use in mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction fieldACTIVE
041Education services, namely, teaching in the field of construction; providing information and training in the field of noise and construction site nuisances and disturbances; technical and practical training and education demonstrations in the use of an IT platform for control of noise and construction site nuisances and disturbances; development and provision of educational content pertaining to construction including recommendations for controlling and reducing noise and construction site nuisances and disturbances; organization of conferences on control and reduction of noise and construction site nuisances and disturbances; writing, editing and publication of texts other than advertising texts in the field of control and reduction of noise and construction site nuisances and disturbancesACTIVE
042Environmental testing; technical advice concerning damage detection in the construction field; analysis of scientific data pertaining to environmental impact, safety, productivity, asset management and sustainability in the construction field; preparation of scientific reports; conducting of technical and scientific project studies in relation to mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction field; software design, development, installation, customization, maintenance and updating of recorded or downloadable software used in relation to mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction field; computer system design and analysis in relation to mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction field; computer data recovery, electronic storage and external backup; all these services for use in mastering the challenges of environmental impact, safety, productivity, asset management and sustainability in the construction fieldACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 8, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 16, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 16, 2025FIMPFINAL DISPOSITION PROCESSED
Dec 3, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Sep 3, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Sep 3, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 1, 2024GPNXNOTIFICATION PROCESSED BY IB
Jun 30, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jun 18, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jun 18, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 11, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 11, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Jun 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 7, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
May 29, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
May 16, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
May 16, 2024XAECEXAMINER'S AMENDMENT ENTERED
May 16, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
May 16, 2024GNEAEXAMINERS AMENDMENT E-MAILED
May 16, 2024CNEAEXAMINERS AMENDMENT -WRITTEN
Dec 8, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Dec 8, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 8, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 3, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 2, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 2, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 17, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
May 24, 2023RFNTREFUSAL PROCESSED BY IB
May 2, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 2, 2023RFRRREFUSAL PROCESSED BY MPU
Mar 11, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 10, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 6, 2023DOCKASSIGNED TO EXAMINER
Jan 7, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Jan 3, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 29, 2022REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance