USPTO serial 79358846
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric car charging piles; electric-car battery charger; solar battery chargers; solar energy collectors for electricity generation, , namely, solar panels for the production of electricity; photovoltaic modules; photovoltaic installations for generating electricity, , namely, photovoltaic solar panels for the production of electricity; photovoltaics, , namely, photovoltaic cells; solar cells; solar wafers; photovoltaic solar modules for production of electricity; portable solar panels for generating electricity; solar batteries; solar panels for the production of electricity; solar cells for electricity generation; solar-powered rechargeable batteries; photovoltaic apparatus for converting solar radiation to electrical energy, , namely, photovoltaic cells; batteries; battery leads; rechargeable batteries; electric batteries for vehicles; electric batteries for powering electric vehicles; load indicators, , namely, voltmeters; electrical adapters; mobile apps, , namely, downloadable mobile applications for control of energy generation and battery charging; computer software applications, downloadable for control of energy generation and battery charging; downloadable software and applications for mobile devices for energy generation and battery charging; computer software for mobile applications, , namely, downloadable software that enables interaction and interface between vehicles and mobile devices; downloadable computer programs for operating electronic cash register systems; payment software, , namely, downloadable software for processing electronic payments; downloadable software for processing electronic payments; electronic payment terminals; apparatus and instruments for controlling the use of electricity, , namely, electrical controllers; none of the aforementioned being used in relation with rail and urban rail transport as well as railway engineering | ACTIVE | — |
| 037 | Battery charging for electric vehicles using energy from renewable sources; battery charging for electric vehicles using energy from conventional sources; recharging services for electric vehicles; recharging of batteries; recharging of batteries and accumulators; installation of solar powered electrical systems; installation and maintenance of photovoltaic installations; replacement of batteries, namely, recharging of batteries; maintenance and repair of electric vehicles; charging of batteries and power storage devices, and rental of equipment therefore; service stations for the maintenance of vehicles, namely, automobile service station services; electrical system installation services; installation of electrical and generating machinery | ACTIVE | — |
| 040 | Generation of electricity from solar energy; production of electrical power from renewable sources; generation of power; rental of batteries; rental of electricity generators; consultancy services relating to the generation of electrical power | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 18, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 26, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 26, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 21, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 21, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 21, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 3, 2023 | ATRV | ATTORNEY REVIEW COMPLETED | — |
| Sep 18, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 5, 2023 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Sep 5, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 5, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 30, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 30, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 16, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 28, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 7, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 6, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 6, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 6, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jul 6, 2023 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jul 6, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 6, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 6, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 6, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 26, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 7, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 7, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 8, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Apr 18, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 17, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 12, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 7, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 3, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 30, 2022 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |