Drawing for FERROVIAL ENERGY INFRASTRUCTURE

USPTO serial 79359904

FERROVIAL ENERGY INFRASTRUCTURE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
Examiner
AVENT, TEAGUE A
Law office
TMO LAW OFFICE 126

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with FERROVIAL ENERGY INFRASTRUCTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
035Advertising, marketing and promotional services; commercial trading and consumer information services in the nature of business consultancy in the field of energy generation, transmission, distribution and storage; business assistance, management and administrative services in the field of energy generation, transmission, distribution and storage; business data analysis, business research and business information services; procurement of contracts for others for the purpose of energy supply; energy price comparison servicesACTIVE
036Financial, monetary, and banking services, namely financial and banking structuring consultancy for financing energy generation, transmission, distribution or storage facilities and projects; financial valuation and appraisal services for energy generation, transmission, distribution or storage facilities; agencies for collecting electric power utility paymentsACTIVE
037Building construction and demolition services; rental of tools, machinery, heavy equipment and equipment for building and energy generation, transmission, distribution, or storage installations, construction and demolition; installation, repair and maintenance of buildings, constructions, roads, car parks, oil and gas pipelines, canals, electrical and sanitary installations, ventilation systems, fire-prevention systems, sewers and water supply networks; energy and facilities and apparatus cleaning services; maintenance and repair of energy generating installations; maintenance, overhaul being renovation and repair of electric energy generating, transmission, distribution and storage apparatus and installations; installation of wind power systems; construction of geothermal energy installations; installation of electric light and power systemsACTIVE
039Distribution of energy by pipeline and cable; distribution of energy; storage of energy and fuels; information and advisory services in relation to the distribution of energyACTIVE
040Custom assembly services, namely custom manufacture in the nature of energy generation, transmission, and storage equipment; energy production; recycling and waste treatment; consultancy relating to the generation of electrical powerACTIVE
041Training for the operation, maintenance and use of energy generation, transmission and storage apparatus and installationsACTIVE
042Science and technology services, namely technology support in the field of energy generation, transmission and storage, and measurement of renewable resources for generation of energy; testing, authentication and quality control, namely testing of energy generation, transmission, and storage apparatus; design services in the nature of design of energy generation, transmission and storage software, apparatus, installations and facilities; energy auditing in the nature of remote monitoring of the performance of energy generation, transmission, distribution or storage facilities and in the nature of measurement of renewable resources for generation of energy; scientific and technological research in the field of energy; scientific and technological consultancy in the field of energy-saving; design and development of energy distribution networksACTIVE
045Safety, rescue, and security services namely, consulting in the field of workplace safety; legal servicesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 19, 2026FINTFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 3, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB
Mar 3, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 3, 2025ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 11, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Jun 30, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jun 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 7, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 19, 2024RFNTREFUSAL PROCESSED BY IB
Feb 2, 2024IRRHIRREGULARITY FROM IB EXAMINED BY MPU
Feb 2, 2024IRRHIRREGULARITY FROM IB EXAMINED BY MPU
Jan 19, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jan 16, 2024IRRFIRREGULARITY ON REFUSAL FROM IB
Jan 16, 2024IRRFIRREGULARITY ON REFUSAL FROM IB
Dec 6, 2023GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 6, 2023GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 6, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 3, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 3, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 3, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 18, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB
May 31, 2023RFNPREFUSAL PROCESSED BY IB
May 11, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 10, 2023RFRRREFUSAL PROCESSED BY MPU
Mar 21, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 20, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 20, 2023DOCKASSIGNED TO EXAMINER
Jan 13, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Jan 9, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 6, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance