USPTO serial 79360137
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Buildings, transportable, of metal; portable buildings of metal; buildings and greenhouses of metal, transportable; metal greenhouse frames, not included in other classes; modular metallic buildings for the installation of solar batteries; metal greenhouses. | ACTIVE | — |
| 007 | Power-operated lifting, moving and handling equipment, namely, cranes for lifting and transporting containers, stackers and de-stackers for containers, powered conveyors to transport containers, picking and placing robots for pots; Street sweeping machines; container cleaning machines; container washing machines; laundering machines being container washing machines; Dividing machines, namely, repacking stations; Fixed and mobile cranes; Stacking machines; Chain conveyors. | ACTIVE | — |
| 035 | Procuring of contracts for the purchase and sale of goods, namely, construction and transportable structures of metal, building and construction materials and elements of metal, containers and articles for transport and packaging of metal, conveyor tracks, moving and loading and unloading equipment, sweeping, cleaning and washing machines, distribution machines, fixed and mobile cranes, stacking machines, conveyors being transport machines. | ACTIVE | — |
| 037 | Installation of outdoor automation equipment for greenhouse horticulture, namely, logistics solutions for cultivation systems to enhance crop production, distribution systems for floral and plant merchants, mobile repack stations for fruits and vegetables, and cultivation and presentations tables for crops. | ACTIVE | — |
| 042 | Engineering, research, and design services in the field of structures and transportable structures of metal, building and construction materials and elements of metal, containers and articles for transport and packaging of metal, conveyors, handling and loading and unloading equipment, sweeping, cleaning and washing machines, dividing machines, fixed and mobile cranes, stacking machines, conveyors being transport machines. | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 25, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 8, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 8, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 23, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 23, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 23, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 10, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 8, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 7, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 7, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 17, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 17, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 17, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 4, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 29, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 29, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 29, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 30, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 26, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 1, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 1, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 12, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 11, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 17, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 12, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |