USPTO serial 79360181
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Branching pipes of metal for pipelines; metal adaptors for pipes in the nature of pipe elbows, supports, fittings, branches and couplings; pivoting fittings of metal for pipes; pipe collars of metal; flanges of metal; metal clamps for pipes; couplings of metal for tubing; couplings of metal for pipelines; couplings of metal for pipes; metal coupling elements for tubing; metal coupling parts for tubing; pipe fittings, namely, junctions of metal; pipe spacers of metal; fittings of metal for pipes; fitting elements of metal for pipes; pipe bends of metal other than parts of machines; ducts made of metal for trunking conduits for liquids; ducts made of metal for trunking pipes for gases; ducts made of metal for trunking pipes for liquids; metal air conditioning ducts; ducts of metal for concealing water pipes; metal pipe supports; collars of metal for fastening pipes; elbows of metal for pipes; elbows of metal for pipes including those from alloy steel and titanium; metal joint connectors for pipes; junctions of metal for pipes, namely, alloy steel and titanium; pipe muffs of metal; clips of metal for pipes; pipe support sleeves of metal; junctions of metal for pipes; pipe couplings of metal; connectors of metal for pipes; connectors of metal for pipelines; junctions of metal for pipelines; junctions of metal for tubes; manifolds of metal for pipelines | ACTIVE | — |
| 037 | Construction, namely, supervising, planning and building realization; installation services and repair, in relation to fabrication of pipelines and pipe-fitting; pipe laying; renovation of plumbing; services for the repair of pipes; services for the repair of conduits; servicing of conduits; servicing of pipes; pipeline laying; tube laying; pipe installation services; pipeline maintenance; construction of pipelines; conduit laying; servicing of tubes; installation of pipework systems; installation of industrial piping, especially installation of mechanically rolled pipelines; laying and construction of pipelines; pipeline construction and maintenance; advisory services relating to pipe laying, especially information, in relation to mechanically rolled pipelines; maintenance and repair of pipelines; pipeline installation and repair; maintenance and repair of pipeline systems; maintenance and repair of conduit systems; maintenance and repair of industrial piping; maintenance and repair of pipes used in industrial equipment; installation of pipe systems for conducting of liquids, especially, installation in relation to mechanically rolled pipelines; installation of pipe systems for conducting of steam, especially, installation in relation to mechanically rolled pipelines; assembly of pipelines by connection of the pipes; assembly of pipes by non-welded connection of the pipes | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 19, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 5, 2026 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 5, 2026 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 15, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 15, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 15, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 27, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 27, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 21, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 24, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 23, 2025 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 23, 2025 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 23, 2025 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 14, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 14, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 14, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 10, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 9, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 9, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 9, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 11, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 20, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 20, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 17, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 16, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 13, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 17, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 12, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |