USPTO serial 79360213
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Steel pipes and tubes; steel in sheet form, namely, steel sheet piles; steel plates and sheets; sheet metal, not of precious metal; steel wire; iron, unwrought or semi-wrought; steel, unwrought or semi-wrought; titanium; titanium alloy; non-ferrous metals and their alloys; construction materials, namely, metal piles; branching pipes of metal; reinforcing materials of metal for buildings; framework of metal for building; steel pipes, namely, steel pipe piles; steel pipe couplings and joints; metal pipe couplings and joints; pre-fabricated metal building assembly kits; metal flanges; containers of metal for transport; metal joinery fittings; wire rope | ACTIVE | — |
| 007 | Metalworking machines; metalworking machine tools; rolling mills; rolling machines for rolling metals; rolling mill rolls being parts of metalworking machines; rolling mill cylinders for machines; mechanical control apparatus for metal rolling machines, namely, hydraulic controls for machines, pneumatic controls for machines, thermostatic control valves for machines; crank shafts for construction machines, land vehicles, airplanes and vessels | ACTIVE | — |
| 012 | Engines for land vehicles; turbines for land vehicles; motors for land vehicles; axles for vehicles; axle journals for aircrafts, automobiles, bicycles, motorcycles, railway rolling stocks and ships; shaft couplings for land vehicles; wheel bearings for land vehicles; gear boxes for land vehicles; clutches for land vehicles; transmission chains for land vehicles; transmission mechanisms for land vehicles; transmission shafts for land vehicles; shock absorbing springs for vehicles; buffers for railway rolling stock; motors, electric, for land vehicles; vessels being boats and ships; steering wheels for vessels; steering gears and rudders for vessels; screw propellers for vessels; aircraft; bodies for aircraft; wings for aircraft; aircraft parts, namely, brake discs, brake linings and related mechanical parts therefor; landing gear wheels of aircraft; axle, undercarriages and couplings for railway rolling stock; railway bogies; automobiles; doors for automobiles; bumpers for automobiles; two-wheeled motor vehicles; bicycles; flanges for railway wheel tires | ACTIVE | — |
| 037 | Construction of civil engineering structures; building construction; factory construction; harbour construction; road construction; pier construction; marine construction; underwater construction; providing construction information; construction consultancy; maintenance of building equipment | ACTIVE | — |
| 040 | Metal welding; metalworking, namely, metal pressing; metalworking, namely, shaping of metal components; metalworking; metal treating; metal casting | ACTIVE | — |
| 042 | Engineering services in the field of energy technology, building technology, communications technology and environmental technology; architectural services; architectural consultancy; consultancy in the design and development of computer hardware; engineering consultancy in the field of energy technology, building technology, communications technology and environmental technology; computer programming; design and development of online computer software systems; technical advice relating to operation of computers; technological advice in relation to the technology research relating to automobiles; technological advice in relation to the technology research relating to industrial machines; testing of metal materials and research of new products for others in the field of metal materials and consultancy and information services relating thereto; research relating to building construction and city planning and consultancy and information services relating thereto; testing and research services in the field of preventing pollution and information services relating thereto; testing and research services in the field of electricity and information services relating thereto; testing and research services in the field of civil engineering and information services relating thereto; testing the functionality and new product research services relating to machines, apparatus and instruments and information services relating thereto; providing computer programs on data networks, namely, providing on-line non-downloadable software for use in database management, for use as spreadsheet, for word processing; providing computer programs on data networks, namely, providing on-line non-downloadable software for use in the automobile industry and other vehicle industries for analyzing and predicting fracturing of steel materials in vehicle parts, vehicle bodies and frames and welds on vehicle parts, vehicle bodies and frames; providing computer programs on data networks, namely, providing on-line non-downloadable software for use in the steel industry for analyzing and detecting defects in steel materials in vehicle parts, vehicle bodies and frames and in welds on vehicle parts, vehicle bodies and frames; providing virtual computer systems through cloud computing | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 17, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 31, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 31, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 19, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 9, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 9, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 23, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 23, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 22, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 3, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 3, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 3, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 19, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 19, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 19, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 19, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 19, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 13, 2023 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 13, 2023 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 13, 2023 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 13, 2023 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 8, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 8, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 8, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 1, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 8, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 8, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 2, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 1, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 23, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 13, 2023 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jan 12, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |