Drawing for POLFAST

USPTO serial 79360293

POLFAST

Reviewed by CopyMark Law Group

Reg. 7525543Status 700Registered
Filing date
Status date
Registration date
Oct 8, 2024
Examiner
TAYLOR, DAVID T
Law office
GENERIC WEB UPDATE

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with POLFAST?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Furnaces and electric coolers for the cement, lime, plaster, ceramic, refractory, smelting, chemical, mining, and the power industriesACTIVE
037Building construction; installation and repair for/of facilities and installations for the cement, lime, plaster, refractory, smelting and chemical industry, for mining and the power industry; construction of facilities and installations for the cement, lime, plaster, refractory, metallurgy, mining, power, energy and chemical industries; construction consultancy relating to facilities and installations for the cement, lime, plaster, refractory, smelting and chemical industry, for mining and the power industryACTIVE
042Engineering design services for cement, lime, plaster, refractory, smelting and chemical industry; Consultancy services in the field of design and development of engineering processes for the cement, lime, plaster, refractory, smelting and chemical industry; Design of cement factory buildings; Physics research, namely, providing energy, calculations and simulations of industrial processes; Testing of raw materials; Providing scientific surveysACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 3, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 16, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB
Mar 16, 2025XXCRGENERIC MADRID TRANSACTION CREATED
Jan 8, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 8, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Oct 8, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 23, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jul 23, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 3, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Jun 17, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 10, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 11, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 11, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 11, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Apr 6, 2024RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED
Apr 6, 2024RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED
Apr 6, 2024RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED
Feb 26, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 26, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 26, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Oct 11, 2023GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Oct 11, 2023GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 11, 2023CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 21, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 21, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 21, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 18, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB
Jun 12, 2023RFNTREFUSAL PROCESSED BY IB
May 22, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 22, 2023RFRRREFUSAL PROCESSED BY MPU
Mar 30, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 29, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 29, 2023DOCKASSIGNED TO EXAMINER
Jan 17, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Jan 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 12, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance