Drawing for GLOBE AID BAND

USPTO serial 79360602

GLOBE AID BAND

Reviewed by CopyMark Law Group

Reg. 7636496Status 700Registered
Filing date
Status date
Registration date
Jan 7, 2025
Examiner
KLUWE, CHERYL D
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GLOBE AID BAND?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019Wall, floor and roofing building materials of plastic, rubber, plaster, lime, cement or synthetic materials, namely, wall boards, floorboards, roofing cement; cement slabs; plastic building materials, namely, boards; synthetic building materials, namely, synthetic roofing shingles, synthetic flooring materials, synthetic rocks for creating landscape settings; non-metal sheets comprised of cement, synthetic fiber, and synthetic resin for use in construction, namely, repair and reinforcement of roofs, walls, floors, and ceilings; asphalt, and asphalt building or construction materials; plaster for building purposes; lime building or construction materials; building or construction materials of plaster; cement and its products, namely, cement slabs, cement mixes, cement mortar pipes; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of cement or concrete constructions and structures; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of cement or concrete constructions and structures; building or construction materials comprised of cement and synthetic resin, namely, sheets for use in repair, reinforcement and protection of roofs, walls, floors, and ceilings; building or construction materials comprised of cement, synthetic resin and synthetic fiber, namely, sheets for use in repair, reinforcement and protection of roofs, walls, floors, and ceilings; sheets comprised of cement and synthetic resin for use in building or construction; sheets comprised of cement, synthetic resin and synthetic fiber for use in building or construction; building and construction materials in sheet form, not of metal, for use in repair, reinforcement and protection of roofs, walls, floors, and ceilings; sheets comprised of cement and synthetic resin for use in repair, reinforcement, protection and/or leak-prevention of buildings or structures; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and/or leak-prevention of buildings or structures; sheets comprised of cement and synthetic resin for use in repair, reinforcement, protection and/or leak-prevention of roofs; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and/or leak-prevention of roofs; roofing in sheet form comprised of cement and synthetic resin; roofing in sheet form comprised of cement, synthetic resin and synthetic fiber; sheets comprised of cement and synthetic resin for use in repair, reinforcement, protection and/or leak-prevention of walls; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and/or leak-prevention of walls; building materials, namely, wall materials in sheet form comprised of cement and synthetic resin for use in repair, reinforcement, protection and leak-prevention of walls; building materials, namely, wall materials in sheet form comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement, protection and leak-prevention of walls; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of gutters; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of gutters; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of water supply pipes and sewage pipes; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of water supply pipes and sewage pipes; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of manhole covers; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of manhole covers; sheets comprised of cement and synthetic resin for use in repair, reinforcement and/or protection of pipelines; sheets comprised of cement, synthetic resin and synthetic fiber for use in repair, reinforcement and/or protection of pipelines.ACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 8, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 3, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB
Jul 3, 2025XXCRGENERIC MADRID TRANSACTION CREATED
Apr 7, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 28, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Jan 7, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Jan 7, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 19, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 19, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 11, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 8, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 2, 2024DOCKASSIGNED TO EXAMINER
Jul 1, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jul 1, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 1, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 18, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jun 17, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Feb 6, 2024RFNTREFUSAL PROCESSED BY IB
Jan 4, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 4, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 4, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 4, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 17, 2023RFNTREFUSAL PROCESSED BY IB
Sep 22, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 22, 2023RFRRREFUSAL PROCESSED BY MPU
Sep 6, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 5, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 30, 2023RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW
Aug 10, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 9, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 4, 2023DOCKASSIGNED TO EXAMINER
Feb 7, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Feb 2, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jan 25, 2023LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED
Jan 19, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance