USPTO serial 79360818
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Sensors for structural monitoring, namely, internet of things sensors for industrial calibration and measuring vibration, proximity sensors, pressure sensors, seismic sensors, tension sensors, tilt sensors, acceleration sensors, vibration sensors, motion sensors, and temperature sensors; sensors for determining position, velocity and acceleration and temperature; detectors for detecting motion, vibration, tilt, acceleration, temperature and seismic activity and monitoring instruments in the nature of alarm monitoring systems; monitoring instruments in the nature of electronic monitoring devices comprised of microprocessors, accelerometers, and computer hardware and embedded computer software for monitoring earth, soil and rock surfaces; electronic monitoring devices comprised of microprocessors, accelerometers, computer hardware and embedded computer software for monitoring and measuring the structural integrity of bridges, dams, viaducts, buildings, roads, railways, subway systems, tunnels, mines and structures; electronic monitoring instruments, other than for medical use, in the nature of monitoring and measuring systems comprised of pressure, proximity and seismic sensors, nodes in the nature of computers, telecommunication switches, network routers, vibration, frequency, and sound level meters, wireless communication devices for the monitoring of structures being wireless vibration sensors, wireless pressure sensors, wireless proximity sensors, and wireless seismic sensors, and embedded software for monitoring the health of structures following a seismic event, monitoring interior temperature of structures and monitoring structural integrity of bridges, dams, viaducts, buildings, roads, railways, subway systems, tunnels, mines and structures; sensors used in plant control for determining acceleration, vibration and tilt; electronic control software systems, namely, a downloadable and recorded Internet of Things (IoT) software platform that enables the capture, processing, and storage of sensory data, data normalization, message parsing, and integration with computing nodes, processors, communication devices and sensors for use in connection with the monitoring and assessment of structural integrity; electronic control units for control of apparatus for monitoring structural integrity; measuring, detecting, monitoring and controlling devices, namely, communication devices in the nature of network servers, computers, computer hardware, amplifiers for wireless communications, and wireless vibration sensors for use in the acquisition and transmission of data for the monitoring and analysis of structural integrity; all of the foregoing for use in connection with civil engineering applications | ACTIVE | — |
| 042 | Testing services for alarm and monitoring systems; monitoring the structural integrity of building structures for quality control purposes; environmental monitoring of contaminated land to determine impact of environmental conditions on structural integrity of bridges, dams, viaducts, buildings, roads, railways, subway systems, tunnels, mines and structures; environmental monitoring services, namely, monitoring of water quality, monitoring of erosion and sedimentation, technical air quality monitoring services; services for monitoring industrial processes, namely, monitoring of acceleration, vibration and tilt on structures and buildings for scientific research purposes; monitoring of activities in the nature of tornadoes, earthquakes, cyclones, hurricanes, temperature variance and environmental conditions for quality control purposes which influence the environment within buildings via use of monitoring and measuring systems and devices for use in connection with structural inspection services on existing structures to determine structural integrity; monitoring of events in the nature of tornadoes, earthquakes, cyclones, hurricanes, temperature variance and environmental conditions for quality control purposes which influence the environment within civil engineering structures via the use of an Internet of Things (IoT) software platform that enables the collection, authentication, and presentation of data, information, and intelligence to assess the structural integrity of bridges, dams, viaducts, buildings, roads, railways, subway systems, tunnels, and mines; environmental testing of vibration; all of the foregoing for use in connection with civil engineering applications | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 4, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 16, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 16, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 8, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 8, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 8, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 23, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 23, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 14, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 3, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 24, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 24, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 17, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 17, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 17, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 17, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 17, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 27, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 27, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 27, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 10, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Apr 10, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 10, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 15, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 15, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 15, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 11, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 21, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 21, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 2, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 1, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 12, 2023 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Jun 12, 2023 | ALIE | ASSIGNED TO LIE | — |
| Feb 22, 2023 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jan 31, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 27, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 26, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |