USPTO serial 79361276
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electricity; recorded or downloadable computer software for managing electricity consumption in the field of electric vehicles; computers and computer peripheral devices; charging docks, namely stations for electric vehicles; battery charging equipment, namely, for use with electric vehicle batteries; charging stations for electric vehicles; downloadable computer software for use in charging electric vehicles; electrical charge controllers; electronic load modules for electric vehicles; electric charging cables; batteries for electric vehicles; electronic transformers; rechargeable electric batteries; electrical distributors in the nature of electrical power distribution units; photovoltaic apparatus for generating electricity; downloadable software for managing, monitoring and optimizing electrical grids; downloadable software for use in energy management and power system control; downloadable software for managing, monitoring and optimizing utility systems and infrastructure: downloadable software for energy transaction services; downloadable software for the management of charging stations for electric vehicles; computer hardware and downloadable software for monitoring of electric vehicles, charging infrastructure data and energy management; downloadable application software for managing electricity consumption in the field of electric vehicles; downloadable operating system programs | ACTIVE | — |
| 041 | Education in the nature of classes, courses of instruction, seminars, webinars and training in the field of electric vehicles; education services, namely, classes, seminars and training courses in the field of electric vehicles; education, namely, classes, courses of instruction, seminars, webinars and training relating to electric vehicles; education namely, classes, courses of instruction, seminars, webinars and training relating to charging stations for electric vehicles; provision of online training in the field of electric vehicles; education namely classes, courses of instruction, seminars, webinars and training related to computer software; education namely classes, courses of instruction, seminars, webinars and training in the operation of software systems; organising of educational conferences in the field of electric vehicles; organising of educational events in the nature of seminars, courses, webinars and conferences in the field of charging stations for electric vehicles; publishing of texts in the field of charging stations for electric vehicles; provision of on-line non-downloadable electronic publications in the nature of blogs and articles in the field of electric vehicles; online non-downloadable electronic publications in the nature of blogs and articles relating to electric vehicles; online non-downloadable electronic publications in the nature of blogs and articles relating to charging stations for electric vehicles | ACTIVE | — |
| 042 | Scientific and technological services, namely scientific and technological research, analysis and testing in the field of electric vehicles and research and design relating thereto; industrial fluid analysis, industrial fluid research in the field of electric vehicles and industrial design services; design and development of computer hardware and software; design and development of computer hardware and software for use in charging electric vehicles; providing online non- downloadable software for managing, monitoring and optimizing electrical grids; providing online non- downloadable software for use in energy management and power system control; providing online non- downloadable software for managing, monitoring and optimizing utility systems and infrastructure; providing online non-downloadable software for energy transaction services; development and design of operating system software; Scientific and technological services namely, research and design in the field of charging stations for electric vehicles; industrial analysis, industrial research and industrial design services; design and development of computer hardware and software; design and development of computer hardware and software for use in charging electric vehicles; providing online non-downloadable software for managing, monitoring and optimizing electrical grids; providing online non-downloadable software for use in energy management and power system control; providing online non-downloadable software for managing, monitoring and optimizing utility systems and infrastructure; providing online non-downloadable software for energy transaction services; development and design of operating system software | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 1, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 2, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jul 2, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Apr 7, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 7, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 7, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 19, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 19, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 13, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 4, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 4, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 4, 2024 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Oct 4, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 3, 2024 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 6, 2024 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Sep 4, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 4, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 4, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 3, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 12, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 12, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 4, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 4, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 4, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 30, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 30, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 30, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 22, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 1, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 1, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 26, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 25, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 25, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 7, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 3, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 2, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |