USPTO serial 79361523
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 012 | Passenger ships; parts of watercraft vessels, namely, mooring gear in the nature of fitted covers and fenders for watercraft vessels; warships, namely, aircraft carriers; pontoon boats; motorboats; barges; rudders; fenders for ships; screw propellers for ships; ship hulls; ice breaker ships; amphibian ships; ships for use in oil or ore drilling; tug boats; ships, namely, oil tankers; boats, namely, dredgers; container ships; cable-laying ships; ferry boats; cargo ships; aeroplanes; helicopters; amphibious airplanes | ACTIVE | — |
| 035 | Arranging of contracts, for others, for the purchase and sale of ships; arranging of contracts, for others, for the purchase and sale of automobiles; arranging of contracts, for others, for the purchase and sale of aircraft; arranging of contracts, for others, for the purchase and sale of products; commercial intermediation services, namely, mediation of contracts for purchase and sale of products; brokerage of commercial transactions for others, namely, arranging of trading transactions and commercial contracts, negotiation and settlement of commercial transactions; business intermediary services for the sale and purchase of goods and services | ACTIVE | — |
| 037 | Stadium construction; road construction in the nature of overpass construction; amusement and recreational park construction; factory construction; irrigation devices installation and repair; construction of bridges; drilling of wells; construction of dams and water storage facilities; construction of roads; road paving; pier breakwater building; underwater construction; apartment construction; construction of row houses; construction of efficiency apartment; nuclear reactor construction; diving and underwater construction; shipbuilding; steel structure construction works; building reinforcing; construction of reinforced concrete structures; railway construction; tunnel construction; construction of pipelines; construction of waste disposal facilities; harbour construction; repair of ships; repair of transport machinery and apparatus; installation of computer hardware; aircraft maintenance | ACTIVE | — |
| 039 | Car rental; vehicle rental; railway transport; refloating of ships; aircraft rental; air transport; provision of berthing facilities for harbour; underwater and boat salvaging; marine transport; freighting services; stevedoring; transport brokerage | ACTIVE | — |
| 042 | Design of heating and cooling apparatus; technical design services relating to heating installations; interior and exterior design services; interior architectural design services; space planning in the nature of design of interiors; commercial space interior design; design services for the interior of buildings; engineering consultancy in the field of prediction and optimal management of building energy; professional consultancy relating to energy efficiency in buildings; recording data for others relating to energy consumption in buildings; providing information in the field of interior design via a web site; consultation services relating to interior design | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 19, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 26, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 26, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 24, 2023 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Oct 24, 2023 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 8, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 8, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 19, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 30, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 30, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 29, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 29, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 29, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 29, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 9, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 8, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 10, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 7, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 3, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 2, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |