Drawing for RUVOLUM

USPTO serial 79362580

RUVOLUM

Reviewed by CopyMark Law Group

Reg. 7341838Status 700Registered
Filing date
Status date
Registration date
Apr 2, 2024
Examiner
LAVACHE, LINDA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RUVOLUM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Downloadable and recorded software for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; Downloadable application software for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; Downloadable software applications for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systemsACTIVE
042Updating, design, installation, and maintenance of software; rental of computer software for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; engineering and architectural services; advice and research in the field of geology and slope stabilization science, engineering and information technology; advisory services with respect to geological surveys and studies; conducting computer-aided scientific analyses of slopes needing stabilization; design services, namely, software development; design of computer-simulated models; engineering services; providing temporary use of non-downloadable web-based software applications for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; engineering work, namely, surveying; engineering services; engineering services in the field of construction; engineering consulting services; software as a service (SaaS) services featuring software for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; computer platform as a service (PaaS) services featuring software platforms for dimensioning and measuring slopes, making calculations pertaining to slope stabilization, and designing and planning slope stabilization systems; technical expertise, namely, engineering services; conducting technical measurements of slopes requiring stabilization; technical project planning in the field of construction, namely, construction drafting; technical project development in the field of engineering, namely, drafting of plans and engineering drawings and calculation for others; conducting of technical project studies, namely, conducting of scientific feasibility studies; engineering services, namely, development of calculation and dimensioning concepts for protective structuresACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 9, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 18, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB
Oct 18, 2024FIMPFINAL DISPOSITION PROCESSED
Jul 3, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 2, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Apr 2, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 16, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 16, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 13, 2024GPNXNOTIFICATION PROCESSED BY IB
Dec 27, 2023OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 27, 2023OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 27, 2023NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 13, 2023CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 7, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 7, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 7, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 13, 2023RFNTREFUSAL PROCESSED BY IB
Aug 18, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 18, 2023RFRRREFUSAL PROCESSED BY MPU
Jul 20, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 19, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 17, 2023DOCKASSIGNED TO EXAMINER
May 23, 2023LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Mar 19, 2023LIMGLIMITATION OF GOODS RECEIVED FROM IB
Feb 17, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Feb 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 10, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance