Drawing for CURRENT OS

USPTO serial 79363279

CURRENT OS

Reviewed by CopyMark Law Group

Reg. 7628614Status 700Registered
Filing date
Status date
Registration date
Dec 31, 2024
Examiner
SAUNDERS, ANDREA DAWN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with CURRENT OS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines and motors for operating power stations, parts and accessories for power stations in the form of generators, compressors for machines, pumps being parts of machines, regulators being parts of machines, hydraulic turbines, wind turbines, and gas turbines, other than for land vehicles, electric power generators and overheating devices and superchargers; direct current generators; direct current motors; solar power electricity generators; heat exchangers being parts of machines; dynamos; current generators; electrical pumps; regulators as parts of machines; alternators; servomotors; alternating current servo motors; transmissions for machines; electricity generatorsACTIVE
009Apparatus and instruments for conducting, distributing, converting, storing, regulating and controlling electric current; smart thermostats; thermostats; solar panels for the production of electricity; data processing equipment and accessories, electrical and mechanical, namely, bar-code and QR scanners, computer monitors, blank data storage devices in the nature of memory modules, memory cards and hard drives, and computer peripherals; downloadable software for controlling electrical systems in energy management, power management, and building management; direct current converters; converters, electric; current convertors; DC/AC power converters; power connectors; electrical rectifiers; electrical connectors; cable connectors; energy regulators; electric control devices for energy management; apparatus for monitoring electrical energy consumption; network controlling apparatus for controlling lighting, switches, gateways, and routers; grids for batteries; transistor sockets; electric sockets; electric power supply sockets; batteries; electric cables and wires; alternator rectifiers; electronic control systems for machines; galvanic batteries; direct current power supplies; power units in the nature of batteries; electric power supply units for lighting; AC/DC power supplies; dc input power supplies; batteries; power cables; electricity conduits; cables, electric; electric current control devices; power inverters; electric apparatus for commutation, namely, commutators; electronic surveillance apparatus; measuring devices, electric; battery chargers; switchboxes; branch boxes to split power supply into multiple branches; power distributing boxes; junction boxes; electric circuit closers; galvanometers; voltage stabilizers; electric transformers; tap changers for electric transformers; electric safety relays; safety contact plugs; photovoltaic modules; photovoltaic inverters; diodes; USB cables; circuit breakers; conductors, electricACTIVE
042Consultancy in the field of energy measurement to improve energy-saving; professional consultancy in the field of energy measurement to improve energy efficiency in buildings; energy auditing; development of energy and power management systems; design and development of energy distribution networks; design of heating installations; programming of energy management software; design and development of energy management softwareACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 5, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jun 18, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB
Jun 18, 2025FIMPFINAL DISPOSITION PROCESSED
Mar 31, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Dec 31, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED
Dec 31, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 12, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 12, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 23, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 3, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 2, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 2, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 2, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 10, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Jul 22, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Jul 21, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 30, 2024GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Apr 30, 2024GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Apr 30, 2024CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 28, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 28, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 28, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 25, 2023RFNTREFUSAL PROCESSED BY IB
Sep 29, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Sep 29, 2023RFRRREFUSAL PROCESSED BY MPU
Sep 19, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Sep 18, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2023DOCKASSIGNED TO EXAMINER
Mar 3, 2023MAFRAPPLICATION FILING RECEIPT MAILED
Feb 27, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Feb 23, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance