USPTO serial 79364130
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
TR
Other trademarks owned by KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
TR
KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
TR
Other trademarks owned by KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
TR
Other trademarks owned by KORDSA TEKNIK TEKSTIL ANONIM SIRKETI
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
P. Jay Hines
P. Jay Hines Muncy, Geissler, Olds & Lowe, P.C.121 S. Royal St.Alexandria, VA 22314UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemicals used in industry and science; manures and top soils; unprocessed artificial resins and unprocessed plastics; fire extinguishing compositions; industrial adhesives not for medical, household and stationery purposes | ACTIVE | — |
| 017 | Urethane rubber, gutta-percha, unprocessed gum, amianthus mica as powder, plaque, bar and folio; insulating materials; flexible pipes and hoses made from gum, plastic or rubber including the ones for vehicles; hoses of textile; pipe cases and sleeves not made from metal specially adapted for flexible pipes made from gum, plastic, or rubber; radiator connecting hoses for vehicles | ACTIVE | — |
| 019 | Sand, gravel, crushed building stone, asphalt, bitumen, cement, gypsum tiles, plaster, concrete, marble blocks for construction; building materials in the nature of concrete, gypsum tiles, clay flooring, potters' clay, building stone, marble, preserved wood for building, construction, road construction purposes; non-metallic transportable buildings; poles not of metal for power lines; crash barriers not of metal; natural and synthetic asphalt roof coatings in the form of panels and sheets, being building materials; bitumen cardboard coatings for roofing; bitumen coating for roofing; doors and window frames of wood; traffic signs not of metal, non-luminous and non-mechanical, for roads; monuments and statuettes of stone, concrete and marble; building glass; prefabricated swimming pools not of metal; aquarium sand | ACTIVE | — |
| 024 | Woven or non-woven textile fabrics; household textile products, namely, curtains of textile, dining linen, bedding in the nature of bed spreads, bed sheets, pillow cases, children's blankets, duvets, towels; flags, pennants, labels of textile | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 6, 2026 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jul 16, 2026 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 23, 2026 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| May 23, 2026 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Feb 11, 2026 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 11, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 11, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 23, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 23, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 17, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 20, 2025 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 20, 2025 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 20, 2025 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 20, 2025 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 20, 2025 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 20, 2025 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Feb 20, 2025 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Feb 20, 2025 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Aug 17, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Aug 1, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 31, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 26, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 26, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 26, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 4, 2024 | CRSN | CORRECTION SENT TO IB | — |
| Jan 3, 2024 | CRCR | CORRECTION CREATED FOR IB | — |
| Oct 4, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 12, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 12, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 22, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 21, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 10, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 7, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 3, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 2, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |