USPTO serial 79365430
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Greger
Jeffrey H. Greger Hauptman Ham, LLP2318 MILL RD.SUITE 1400ALEXANDRIA, VA 22314| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Non-electric elements of metal, namely, metal anchoring and suspension clamps, rings being ring-shaped fittings of metal, anchor lug bolts, metal bolts, washers being metal hardware, metal nuts, double arming bolts of metal, collars being cable junction sleeves of metal, fittings of metal in the nature of cable binding screws, metal spacer brackets, metal dowel brackets, metal turnbuckles, metal screws, stainless steel strips and sealing caps, wire meshes, metal end caps for cables, metal junction sleeves for non-electric cables, all the forgoing being for use in fixing, suspension or branching of overhead or underground electric cables, particularly on partitions, walls, posts or pylons; elements of metal for cable earthing and grounding equipment for the safety of persons in contact with or at a distance from low or high voltage power lines or installations, namely, connectors being metal clips for cables, metal grounding clamps, metal lug bolts, cut-off bars being metal latch bars, steel rod grounding grids and steel plates, and metal grounding stakes; non-electric hardware of metal for ensuring the safety of the electricity grid and for protecting wildlife, namely, fences of metal, bird repellent spikes of metal; devices of metal for protecting the base of wooden electricity poles from damage caused by birds and other animals, namely, metal wire mesh, fences of metal, metal chainlink fencing; avifaunal deterrent devices of metal for power lines and equipment, namely, bird repellent spikes of metal; avifaunal support bars of metal in the nature of metal railings for installation on overhead switches; avifaunal support perches of metal in the nature of metal railings for installation on electricity poles and pylons; non-luminous colored metal beacons for avifauna | ACTIVE | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric wires, electric switches, electric transformers; apparatus for indicating, detecting, and measuring electric voltages on or near overhead and underground electric power lines and installations, namely, voltage testers and voltage monitor modules; connections for overhead and underground low and high-voltage electric lines, in particular, electrical connectors, satellites for connectors, pin adapters being electrical adapters, connection bars being electric connections, watertight junction modules being watertight electric junction boxes, electrical power line connectors, cable junction sleeves being sleeves for electric cables, connection nozzles being connections for electric lines, and electrical terminal blocks; battery chargers and battery charging equipment being battery charge devices; electrical ducts for passing electric cables; avifaunal indicator and signalling apparatus, namely, electrical sensor apparatus for sensing the presence or absence of avifauna by contact or pressure and rotating lights for alerting of the presence of avifauna; avifaunal luminous beacons, namely, luminous beacons for avifauna safety or warning purposes; electric avifaunal visual markers in the nature of rotating lights for overhead power lines; wire connectors; busbars being electrical power distribution blocks and electric connections for use in avifaunal protection | ACTIVE | — |
| 017 | Insulating materials, namely, insulating coatings for anchoring and suspension clamps, corner guides being cable connector fittings, elastic tensioners being bungee cords, anchor lugs being anchor bolts, mounting brackets, dowel brackets and dowels, all being for use in the fixing, suspension and branching of overhead and underground electric cables on partitions for building, concrete walls, poles, and pylons; insulation materials for protection, prevention and safety against the effects of electric current, namely, insulators for overhead-underground lead-in and lead-out cables, cable end caps being insulators for electrical cables, electrical insulators, grounding insulators being electrical insulators for electric ground wire, insulated junction sleeves for power lines, and protective electrical insulating tape strips; insulating materials for ensuring the safety of the electricity grid and protection against wildlife; rubber insulating caps for electrical insulators; insulating materials, namely, insulating caps for protection against all electrical discharge caused by birds on equipment and overhead power line conductors; insulating sleeves for power lines for protection against all electrical discharge caused by birds on power line equipment and overhead power line conductors | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 21, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 21, 2024 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jul 21, 2024 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jun 13, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 12, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Mar 12, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 26, 2023 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 26, 2023 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 26, 2023 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 6, 2023 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 6, 2023 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 6, 2023 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 17, 2023 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 28, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 26, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 25, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 25, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 13, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 22, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 22, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 28, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 27, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 16, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |