USPTO serial 79366907
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Katherine Koenig
Katherine Koenig Koenig IP Works, PLC2208 Mariner Dr.Fort Lauderdale, FL 33316UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal construction systems for railway constructions, in particular for railway constructions in areas with bicycle traffic, comprised of elongate metal boxes, elongate metal cover panels, metal screws, metal fasteners, metal profiles; modular metal construction systems for use alongside tracks for housing elastomer profiles to fill open guide rails of railway constructions, in particular railway constructions in areas with bicycle traffic, comprised of elongate metal boxes, elongate metal cover panels, metal screws, metal fasteners, metal profiles | ACTIVE | — |
| 017 | Seals of rubber for railway constructions, in particular to fill open guide rails of railway constructions; elastomer profiles in the nature of extruded elongate elastomer profiles, elastomer seals, and insulation and bearings of rubber for railway constructions, in particular elastomer profiles to fill open guide rails of railway constructions; sealing strips of rubber for railway constructions, in particular to fill open guide rails of railway constructions | ACTIVE | — |
| 037 | Installation, maintenance, repair and replacement of seals, insulation and bearings of rubber for railway constructions, in particular for railway constructions in areas with bicycle traffic; installation, maintenance and repair of metal construction systems for railway constructions, in particular for railway constructions in areas with bicycle traffic; installation, maintenance and repair of metal construction systems alongside tracks for housing elastomer profiles to fill open guide rails of railway constructions, in particular of railway constructions in areas with bicycle traffic; installation, maintenance and repair of metal construction systems with sealing strips of rubber for railway constructions, in particular for railway constructions in areas with bicycle traffic; installation, maintenance and repair of railway constructions with metal construction systems alongside tracks with elastomer profiles to fill open guide rails of the railway constructions, in particular of railway tracks in areas with bicycle traffic | ACTIVE | — |
| 042 | Engineering design and consultancy, in relation to bicycle-safe design of railway constructions, in particular in relation to metal construction systems alongside tracks with elastomer profiles to fill open guide rails of the railway constructions; industrial analysis and research services in the field of bicycle safety of railway constructions; testing services for quality control of railway constructions in the field of bicycle safety | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 1, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 10, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 10, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 20, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 20, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 20, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 4, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 4, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 15, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 25, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 25, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 25, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 28, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 28, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 28, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 22, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 22, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 22, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 22, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 22, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jan 8, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 15, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 15, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 12, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 11, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 5, 2023 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Nov 10, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 9, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 1, 2023 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Sep 29, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 28, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 14, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 10, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 6, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |