USPTO serial 79367081
APG14
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 7, 2024
- Examiner
- PARKS, KIMBERLY L
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with APG14?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
CA
CA
CA
CA
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sarah Matthews
Sarah Matthews DENTONS DURHAM JONES PINEGAR3301 N Thanksgiving Way STE 400Lehi, UT 84043UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Solid state radio frequency generators for supplying radio-frequency energy; nuclear fusion power generators | ACTIVE | — |
| 009 | AC/DC, DC/AC and DC/radio frequency (RF) inverters for the generation of heat for industrial and commercial processes; radio frequency adapters; radio frequency amplifiers; radio frequency generators for supplying radio-frequency energy; radio frequency mixers; radio frequency receivers; radio frequency repeaters; radio frequency transmitters; radio-frequency antennas; radio-frequency filters; radio-frequency modulators; High intensity pulse radio frequency driven plasma source for nuclear fusion, namely, the generation of positive ions for neutral beam injection systems of fusion devices | ACTIVE | — |
| 037 | Providing information relating to the repair or maintenance of power generators | ACTIVE | — |
| 040 | Assembly in the nature of custom manufacture of power generation engines for others; consultation in the field of custom fabrication of power generation engines; generation of power; providing technical information in the field of power generation | ACTIVE | — |
| 042 | Aerospace engineering; computer hardware engineering; computer software engineering; construction project engineering; consultancy relating to technological services in the field of power and energy supply; electrical engineering; mechanical engineering; nuclear engineering; research in the field of electrical engineering; research pertaining to mechanical engineering; software design engineering; software engineering services for data processing programs; software systems integration engineering; software testing engineering; technical consulting in the field of aerospace engineering | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Aethera Technologies Limited
- Other trademarks owned by Aethera Technologies Limited
- Other trademarks owned by Aethera Technologies Limited
- Other trademarks owned by Aethera Technologies Limited
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named APG14
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 14, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 23, 2024 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 4, 2024 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 4, 2024 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 7, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 7, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| May 7, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 4, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 27, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 20, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 7, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 7, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 31, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 31, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 16, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 11, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 10, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 10, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 22, 2023 | RFNP | REFUSAL PROCESSED BY IB | — |
| Nov 1, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 1, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 1, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 31, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 31, 2023 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Oct 31, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 31, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 17, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 15, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 11, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 7, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |