Drawing for RES POWER FOR GOOD

USPTO serial 79367563

RES POWER FOR GOOD

Reviewed by CopyMark Law Group

Reg. 7435553Status 700Registered
Filing date
Status date
Registration date
Jul 9, 2024
Examiner
MASON, JARED MICHAEL
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RES POWER FOR GOOD?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph R. Dages

Joseph R. Dages Gray Ice Higdon, PLLC3939 Shelbyville RoadSuite 201Louisville, KY 40207

Goods and services

ClassDescriptionStatusFirst use
001Hydrogen; hydrogen gasACTIVE—
004Fuel, namely, hydrogen fuels; gaseous fuels, namely, hydrogen fuelsACTIVE—
007Electricity generation installations, including parts and fittings, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; installations for generating power from natural resources, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; installations for generating power from renewable resources, namely, solar-powered, wind-powered, hydro-powered, geothermal-powered, bioenergy-powered, and hydrogen-powered electricity generators; electricity generators; equipment, and apparatus, namely, electrolysis machines, for the production of hydrogen gas; equipment, and apparatus, namely, centrifugal and positive displacement compressors, for the storage of hydrogen gas; equipment, and apparatus, namely, cryogenic, centrifugal and positive displacement pumps, for the distribution of liquified hydrogen or hydrogen gas; installations, namely, electrolysis machines, for producing hydrogen gas; installations, namely, centrifugal and positive displacement compressors, for storing hydrogen gas; installations, namely, cryogenic, centrifugal and positive displacement pumps, for distributing liquified hydrogen or hydrogen gasACTIVE—
009Hydrogen fuel cells; downloadable computer software for use in the production, control, storage, distribution and transmission of hydrogen; downloadable computer software for use in the operation of hydrogen production, control, storage, distribution and transmission apparatus and equipment; solar panels for the production of electricity; batteries; downloadable computer software for use in the production, control, storage, distribution and transmission of electricity; downloadable computer software for use in the operation of electricity production, control, storage, distribution and transmission apparatus and equipmentACTIVE—
037Construction, installation, and maintenance of electricity generators; construction, installation, and maintenance of energy and power management systems; information, advisory and consultancy services relating to all the aforementioned; construction, installation, and maintenance of hydrogen production facilities; construction, installation, and maintenance of hydrogen storage facilities; construction, installation, and maintenance of hydrogen distribution facilities; construction, installation, and maintenance of energy and power management systems; construction, installation, and maintenance of electricity generation facilities; installation and maintenance of electricity generators; construction, installation, and maintenance of energy and power storage facilities; construction, installation, and maintenance of facilities utilising batteries for electrical energy storage; information, advisory and consultancy services relating to all the aforementionedACTIVE—
039Storage of energy; supply of electricity; energy distribution; renewable fuel distribution; information, advisory and consultancy services relating to all the aforementioned; storage of fuel; storage of fuel, namely, hydrogen fuel; hydrogen fuel distribution; information, advisory and consultancy services relating to all the aforementionedACTIVE—
040Generation of electricity; information, advisory and consultancy services relating to all the aforementioned; production of fuels; production of hydrogen; processing of fuels; processing of hydrogen; information, advisory and consultancy services relating to all the aforementionedACTIVE—
042energy auditing; engineering services; programming of energy management software; design and development of energy management software; development of new energy and power management systems for others; consultancy relating to technological services in the field of power and energy supply; design and development of new energy distribution networks for others; advisory services, professional consultancy, technical and scientific research relating to energy, conservation, environment, power and energy generation, power and energy supply, power and energy distribution, energy efficiency, use of energy, energy conservation and environmental impact; information, advisory and consultancy services relating to all the aforementioned; design and development of new machines, equipment and apparatus for the production, storage and distribution of hydrogen for others; design of new facilities and installations for the production, storage and distribution of hydrogen for others; programming of software for the production, storage, and distribution of fuel; design and development of software for the production, storage, and distribution of fuel; development of management system software for the production, storage, and distribution of fuels; consultancy relating to technological services in the field of fuel production, storage and supply; information, advisory and consultancy services relating to all the aforementionedACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 5, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 18, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 18, 2024FIMPFINAL DISPOSITION PROCESSED—
Oct 9, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 9, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 9, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 30, 2024GPNXNOTIFICATION PROCESSED BY IB—
Apr 23, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 23, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 10, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 10, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 3, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 21, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 21, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Mar 21, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 21, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 21, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 14, 2024ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 12, 2024PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 22, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 22, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Feb 22, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 22, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 22, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 22, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 22, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 20, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 13, 2023RFNPREFUSAL PROCESSED BY IB—
Aug 22, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 21, 2023RFRRREFUSAL PROCESSED BY MPU—
Jul 27, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 26, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 25, 2023DOCKASSIGNED TO EXAMINER—
Apr 21, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 17, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 14, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance