USPTO serial 79367580
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Amy Sullivan Cahill
Amy Sullivan Cahill VICE, COX & TOWNSEND PLLC2303 River RoadSuite 301Louisville, KY 40206| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Prefabricated bridge structures of metal, namely, beams of metal; Prefabricated metal bridges; Building structures of metal, namely, metal railings for fences, balconies, bridges and metal mine working platforms; Building structures of metal, namely, transportable, portable, modular buildings of metal; Building structures of metal, namely, framework of metal for building, frames of metal for building and steel frame for building; Building structures of metal, namely, construction elements made of metal, namely, fabricated metal components for building foundations; Building structure extensions of metal, namely, modular metallic buildings to add to existing building structures; Frames of metal for structures, namely, frames of metal for building, greenhouse frames of metal and door frames of metal; Frames of metal for structures, namely, window frames of metal, cold frames of metal and frames of metal for sliding doors; Structural steels, namely, steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures, steel frames for building, steel angles for use in building construction; Structural steels, namely, steel chains, steel wire rope and steel alloys; Structural steelwork, namely, steel pipes and tubes; Structural steelwork, namely, steel plates and sheets; Tank structures of metal, namely, metal storage tanks, industrial water tanks of metal, liquefied gas storage tanks of metal; Tank structures of metal, namely, metal fluid storage tanks; Tank structures of metal, namely, metal storage tanks for mineral processing; Welded metal structures, namely, metal shelter structures, metal structures for mounting solar panels, prefabricated metal structures with flexible covers for agricultural, commercial or industrial storage; Welded metal structures, namely, portable metal structures with flexible covers for agricultural, commercial or industrial storage; Welded metal structures, namely, modular metal structures with flexible covers for agricultural, commercial or industrial storage and metal structures in the nature of ramps for docking and storing boats; Working platforms structures, namely, metal mine working platforms and metal scaffolding; Working platforms structures, namely, metal mine drilling and working platforms; Gratings of metal; Handrails of metal for stairs; Handrails of metal for use in buildings; Handrails of metal for walkways; Chutes of metal for moving cattle, goods, trash, other than parts of machines; Gravity conveyors being chutes of metal for moving cattle, goods, trash; Wear resistant linings of metallic materials being wall linings of metal for building, linings of metal for building, sheet metal linings | ACTIVE | — |
| 007 | Belt conveyors; Conveyors being machines for use in mines; Chutes being parts of machines; Mine working machines, namely, mine borers, mining drill sharpeners, drills for the mining industry, elevators for use in mines, coal loaders; Mining machines; Machines for use in mines, namely, mine borers, mining drill sharpeners, drills for the mining industry, elevators for use in mines, coal loaders; Machines for use in mines, namely, truck mills for mining purposes; Balancing machines for stacker mining, reclaimer mining and ship loader mining | ACTIVE | — |
| 042 | Development of industrial processes; Development of industrial machinery; Shop design services being engineering drawing services, namely, shop detailing design involving creating detailed drawings and specifications for various components of a structure or machine; Industrial engineering design services; Engineering design; Engineering drawing; Engineering project management services; Design of electrical systems; Design of electronic systems; Design of instruments; Design of pipelines; Design of industrial products; Design of industrial machinery; Industrial design; Quality control for others; Quality control of goods and services; Quality control being inspection of metal goods for quality control purposes; Engineering services in the nature of provision of engineering reports; Mechanical engineering design services; Structural engineering design services; Design planning, namely, initial planning of engineering drawing in mining project design | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 22, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 27, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 27, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 30, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 24, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 24, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 11, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 11, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 19, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 4, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 4, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 4, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 4, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 4, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 1, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 1, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 1, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 29, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 29, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 8, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 19, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 18, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 13, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 12, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 5, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 10, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 5, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 21, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 17, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 14, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |