USPTO serial 79368137
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Sean K. Owens
Sean K. Owens Wood Herron & Evans LLP600 Vine StreetSuite 2800Cincinnati, OH 45202| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Chemical processing machines and apparatus; non-electric prime movers, not for land vehicles; parts of non-electric prime movers, namely, water feeding apparatus for boilers, superchargers, superheaters, scale collectors for boilers, carburetors, injectors, exhaust manifold, pistons, fans, turbines, cylinders, radiators, igniting devices, camshafts, boiler tubes; gas turbines not for land vehicles; steam turbines other than for land vehicles; starters for motors and engines; AC motors and DC motors, not including those for land vehicles but including parts for any AC motors and DC motors; alternators; direct current generators | ACTIVE | — |
| 011 | Drying apparatus and installations, namely, drying apparatus for chemical processing; recuperators for chemical processing; steamers for chemical processing; evaporators for chemical processing; distillation apparatus, not for scientific purposes; distillation apparatus, namely distillation columns for chemical processing; heat exchangers for chemical processing; gas purification apparatus; industrial furnaces; nuclear reactors; gasification furnaces; industrial boilers, other than parts of non-electric prime movers or engine | ACTIVE | — |
| 037 | Repair and maintenance of building equipment; repair or maintenance of air-conditioning apparatus; repair or maintenance of burners; repair or maintenance of boilers; repair or maintenance of pumps; repair or maintenance of freezing machines and apparatus; repair or maintenance of power distribution or control machines and apparatus; repair or maintenance of power generators; repair or maintenance of electric motors; repair or maintenance of chemical processing machines and apparatus; repair or maintenance of industrial furnaces; repair or maintenance of gasification furnaces; repair or maintenance of nuclear power plants; repair or maintenance of chemical plants; repair or maintenance of power generating plants | ACTIVE | — |
| 042 | Designing of machines, apparatus, instruments or systems composed of such machines, apparatus and instruments; research on building construction or city planning; testing or research on prevention of pollution; testing or research on electricity; testing or research on civil engineering; testing or research on machines, apparatus and instruments of power generating plants; scientific analysis of technical operation data of power generating plants and provision of information relating thereto; remote monitoring of operation condition of building equipment for power supplying, gas supplying and heat supplying | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 1, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 15, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 15, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 14, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 14, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jan 14, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 7, 2024 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 18, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 18, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 17, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 17, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 21, 2024 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Aug 21, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 21, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 21, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 8, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 7, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 7, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 7, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2024 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2024 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 14, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 5, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 12, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 12, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 28, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 27, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 27, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 26, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 22, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2023 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |