USPTO serial 79368495
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bassam N. Ibrahim
Bassam N. Ibrahim Buchanan Ingersoll & Rooney, LP1737 King Street, Suite 500Alexandria, VA 22314United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Apparatus for wind power installations, namely, electricity generators and generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; structural and replacement parts and accessories for the aforementioned products, namely rotor blades, blade stands, housings for wind turbines, machine beds, rotation devices in the nature of turntables and their rotating devices, rotary bearings and gears; machines and machine parts, namely, electric motors for machines, bearings, bearing housings, cylinders, valves, switches, brakes, clamping tools, rotary pumps, electric fans, ventilators and blowers for motors and engines for adjusting the angle of wings, brakes and braking devices, main shafts, constant velocity joints, clutches and electric generators | ACTIVE | — |
| 009 | Electronic equipment and computer equipment for windmills, wind power plants, wind turbines and other wind-operated machines as well as wind-powered electricity generators and electric accumulators, namely, electronic accumulators, batteries, electronic integrated circuits, electronic control systems, computer hardware and computer peripheral equipment; energy storage units, namely batteries and power supplies; control and monitoring equipment, including devices for automatically turning generators on and off and automatic start after a power cut, namely, electrical controllers, electric control panels, control units for regulating start-up of electrical motors and video monitors; lightning conductors; microprocessors and microprocessor-based hardware systems, in particular for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, control of the performance and thickness of brake linings, temperature, wind direction and wind speed; watt-hour meters; parts and accessories for the above-mentioned goods, namely, structural and replacement parts, battery chargers and electric cables; downloadable and recorded software for operating, monitoring and automating wind power installations, namely electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; downloadable and recorded software featuring algorithms for controlling wind power installations, namely, electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; downloadable and recorded software for machine learning, downloadable and recorded software using artificial intelligence for use in software development and machine learning, and data analysis; downloadable and recorded artificial intelligence and machine learning software for analysis; all the aforesaid products relating to wind-mills, wind power plants, wind turbines and other wind-operated machines as well as generators and energy storage systems, insofar as they relate to windmills, wind power plants, wind turbines and other wind-operated machines | ACTIVE | — |
| 037 | Construction and assembly services relating to the installation of electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; installation, maintenance, servicing and repair of windmills, wind power plants, wind turbines and other wind-operated machines; advice and information services relating to the aforesaid services | ACTIVE | — |
| 042 | Engineering and technical support relating to windmills and wind power projects and studies, namely, technical consulting in the field of environmental engineering, technical advice relating to operation of computers, technical support services in the nature of troubleshooting of industrial process control computer software problems; conducting scientific feasibility studies, conducting scientific feasibility studies in the field of environmental engineering and technical project planning services, namely, engineering services, technical data analysis, namely, electric meter data analysis, system control data analysis in the nature of system performance and security analysis for ensuring proper functioning of windmills and for protecting data and meteorological data analysis for others, technical testing and measuring services as well as conducting scientific experiments, all the aforesaid services in the field of wind mill and wind power projects, namely, material testing, testing of computer software, product safety testing, environmental testing, testing the functionality of apparatus and instruments in the nature of wind power installations, namely electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; technical consultancy in the field of design and development of a combination of energy supply systems; design and development of systems for regenerative energy production; development and technical inspection of windmills, wind power plants, wind turbines and other wind-operated machines, and components thereof, for third parties; technical research projects for third parties in the field of windmills, wind power plants, wind turbines and other wind-operated machines, namely, product research, material research in the nature of scientific research relating to materials and research in the field of materials science, scientific research, research on electricity and research on environmental engineering; consultancy and information services concerning the aforementioned services; providing software as a (SaaS) services featuring software for use in wind power plant operation; design, development, maintenance and updating of software; design, development, maintenance and updating of software for controlling, regulating and monitoring wind energy systems; development and testing of algorithms and software; all the aforesaid services relating to wind-mills, wind power plants, wind turbines and other wind-operated machines as well as generators and energy storage systems, insofar as they relate to windmills, wind power plants, wind turbines and other wind-operated machines | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 21, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 21, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 21, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 21, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 21, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Feb 1, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 15, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 14, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 23, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 23, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jul 23, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 8, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 7, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 7, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 17, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 17, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 17, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 3, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 3, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 3, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 3, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 3, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 5, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 5, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 5, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 14, 2023 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 14, 2023 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 14, 2023 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 25, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 4, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 4, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 25, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 24, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 24, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| May 4, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 30, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 27, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |