Drawing for MAGNORIC COOLING-HEATING SYSTEM

USPTO serial 79369423

MAGNORIC COOLING-HEATING SYSTEM

Reviewed by CopyMark Law Group

Reg. 7383501Status 700Registered
Filing date
Status date
Registration date
May 14, 2024
Examiner
GADSON, SHARI B.
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MAGNORIC COOLING-HEATING SYSTEM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert S. Broder

Robert S. Broder Collard & Roe, P.C.1077 Northern Blvd.Roslyn, NY 11576UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Heat sinks for use in machines; magnetocaloric cooling systems for use in machines; magnetocaloric heating systems for use in machines; magnetocaloric heat exchanger systems for use in machines; heat exchangers being parts of machines; heat recovery devices, namely, heat exchangers being parts of machines; motors, other than for land vehicles; machine coupling and transmission components, except for land vehicles; agricultural implements other than hand operated hand tools, namely, incorporators; vending machines; automatic vending machines; agricultural machines, namely, cultipackers; air suction machines for industrial purposes; cargo handling machines, automatic; packing machine installations; pumps for machines; electric hand drills; screwdrivers, electric; clippers, namely, plywood clipping machines; bulldozers; crushers for kitchen for industrial use, electric; crushing machines for industrial purposes; rammers being machines; centrifugal machines; lifts, other than ski-lifts, namely, mechanical and hydraulic lifts; sewing machines; knitting machines; ironing machines, namely, electric soldering irons; laundry washing machines; knives, electric; saws machines; industrial robots; printing machines for commercial or industrial use; drilling machines; elevatorsACTIVE—
011Heating installations; air cooling apparatus; magnetocaloric cooling systems; magnetocaloric heating systems; magnetocaloric heat exchanger systems; magnetocaloric water and air cooling installations; magnetocaloric heating installations; magnetocaloric heat recovery installations being ventilators; magnetocaloric heat exchangers not being parts of machines; magnetocaloric systems for the generation of cold, namely, misting and air cooling systems for outdoor cooling; magnetocaloric systems for the generation of heat, namely, heating systems composed primarily of tubes, pipes and pre-assembled manifolds through which cold or low temperature water or fluid circulates; magnetocaloric systems for heat exchange not being parts of machines; space heating apparatus; air-conditioning apparatus; tap-water purifying apparatus; refrigerating apparatus being machines; air purifying apparatus and machines; water purifying apparatus; deep freezing apparatus being deep freezers; chest freezers; air conditioners for vehicles; water purification installations; heat pumps; heat pumps for energy processing; water purification unitsACTIVE—
042New product design; design and development of new products; design and testing for new product development; design and testing of new products; development of new products; conducting technical project studies, namely, scientific feasibility studies; research to develop new products; research and development of new products; research and development of new products for third parties in the field of plastic materials; research and development of new products for others; conducting early evaluations in the field of new pharmaceuticals; product research and development services; testing of new productsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 30, 2024FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 9, 2024FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 8, 2024FIMPFINAL DISPOSITION PROCESSED—
Aug 14, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 14, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
May 14, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 28, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 4, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 27, 2024GPNXNOTIFICATION PROCESSED BY IB—
Feb 27, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 7, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 7, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 7, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 7, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 25, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 25, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jan 25, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 25, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 25, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 5, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 5, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 5, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 4, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 4, 2024ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jan 4, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 4, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 4, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 4, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jul 26, 2023RFNTREFUSAL PROCESSED BY IB—
Jul 6, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 6, 2023RFRRREFUSAL PROCESSED BY MPU—
May 24, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 23, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 19, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
May 15, 2023DOCKASSIGNED TO EXAMINER—
May 15, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 11, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance