Drawing for SASINNO

USPTO serial 79370166

SASINNO

Reviewed by CopyMark Law Group

Reg. 7464582Status 700Registered
Filing date
Status date
Registration date
Aug 6, 2024
Examiner
FRUM MILONE, MARCIE R
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SASINNO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thilo C. Agthe

Thilo C. Agthe Wuersch & Gering LLP100 Wall Street, 10th FloorNew York, NY 10005United States

Goods and services

ClassDescriptionStatusFirst use
007Industrial robots; industrial robots for use in manufacture; industrial robots for working metal; robotic mechanisms being robots for working metal; indoor self-driving robots for industrial use; transportation robots being industrial robots for moving and handling goods and equipment; machinery for working plastic material; industrial robot scotching machines; soldering apparatus, electric; welding and soldering equipment in the nature of gas-operated and electric welding machines and gas-operated and electric soldering irons; soldering irons, electric; industrial robots for use in the mounting of workpieces to be worked on; reflow solder apparatus in the nature of gas-operated and electric soldering irons; control mechanisms for robotic machines being hydraulic controls for machines; machines for the preparation of surfaces for electrical and electronic components being machines for cleaning, etching and coating surfaces in the manufacturing of electrical and electronic components; unmanned transportation conveyors being roller conveyors; conveyors in the nature of belt conveyors, roller conveyors, screw conveyors, and pneumatic conveyorsACTIVE—
009Downloadable software for programming and control of soldering equipment and conveyors for electronics manufacturing; industrial automatic controls incorporating downloadable and recorded software for programming and control of soldering equipment and conveyors for electronics manufacturing; testing devices for electronic parts, namely, testing apparatus for electrical and electronic circuits and for testing the quality and functionality of electronic components in the manufacturing process; electronic components used in machines being electronic control systems for machinesACTIVE—
011Industrial treatment installations being industrial furnaces and industrial humidifiers; thermal treatment furnaces; ovens for use in the electronics industry being curing and reflow ovens for use in electronics manufacturingACTIVE—
037Building repair, building construction and building demolition; construction of industrial plants for electronics manufacturing and for wind power generation, gas power generation, chemical manufacturing, semiconductor manufacturing and geothermal plants; maintenance services for industrial plants, being maintenance of plants for wind power generation, gas power generation, chemical manufacturing, semiconductor manufacturing and geothermal plants; repair of industrial installations being repair of plants for wind power generation, gas power generation, chemical manufacturing, semiconductor manufacturing and geothermal plants; installation of prefabricated building elements being installation of prefabricated walls, roofs, building insulation, and building automation equipmentACTIVE—
040Custom manufacture of semiconductor components, devices and circuits; custom manufacture of prefabricated construction elements; metal brazing being treatment of metal; rental of electric welding apparatusACTIVE—
042Scientific and technology services, namely, research, development, and testing of soldering equipment and industrial robots in the field of advanced manufacturing and automation; creation of control programs for automated measurement, assembly, adjustment, and related visualisation; engineering services relating to roboticsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 15, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 30, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 30, 2025FIMPFINAL DISPOSITION PROCESSED—
Nov 6, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 6, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 6, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 21, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 1, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 17, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 17, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Apr 17, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 17, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 17, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 11, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 11, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 11, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 13, 2023RFNTREFUSAL PROCESSED BY IB—
Nov 10, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Oct 17, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 17, 2023RFRRREFUSAL PROCESSED BY MPU—
Sep 30, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 29, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2023DOCKASSIGNED TO EXAMINER—
May 30, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
May 26, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 25, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance