Drawing for H2NOSTRUM

USPTO serial 79370327

H2NOSTRUM

Reviewed by CopyMark Law Group

Reg. 7592366Status 700Registered
Filing date
Status date
Registration date
Dec 10, 2024
Examiner
EULIN, INGRID C
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with H2NOSTRUM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Vivian Ortiz-Ponce

Vivian Ortiz-Ponce PEREZ GUERRERO LLCP.O. Box 9024163San Juan, PR 00902-4163United States

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy; electrical energy generated by wind turbines; electricity, namely, electrical energy; electrical energy from renewable sources; electrical energy from solar power; electrical energy from green hydrogen; biofuels; biofuel; biogas as fuelACTIVE—
009Electric accumulators; apparatus and devices for controlling energy consumption, namely, electronic apparatus and electronic control devices for controlling energy consumption; downloadable computer applications, namely, downloadable computer software for managing electrical and renewable energy equipment; apparatus for transmitting data; electrical adapters; power adapters; computer housings, namely, computer cases; cases for electronic tablets, namely, protective cases for tablet computers; cases for smartphones; electrical energy analyzers, namely, energy meters for tracking and monitoring energy usage; voltage testers; electric control apparatus, namely, electric control panels; electrical energy control apparatus, namely, electric control panels; electricity storage apparatus, namely, electrical storage batteries; instruments for measuring electricity, namely, clamp meters for measuring electricity; thermal energy measuring apparatus, namely, remote sensors for use in measuring thermal energy waves; electric security monitoring apparatus, namely, alarms and cameras; photovoltaic solar modules for production of solar electricity; apparatus and instruments for controlling electric current, electric current control devices; apparatus and instruments for accumulating electricity, namely, batteries; apparatus and instruments for regulating electricity, namely, apparatus and instruments for regulating electric current; apparatus and instruments for accumulating the distribution of electric current; photovoltaic apparatus for converting solar radiation to electrical energy, namely, photovoltaic thermal module; electrical network supply apparatus, namely, electric switches, detaching switches namely circuit switches for disconnecting electrical currents, flow and voltage transformers, and electric reactors; apparatus for measuring fuel consumption, namely, fuel gauges; chargers for electric batteries; apparatus, instruments and cables for conducting electricity, electric conductors; electric control installations, namely, electric control panels; electric batteries; electric batteries for electric vehicles; rechargeable batteries; solar battery packs; electrical energy power distribution blocks; battery chargers; solar battery chargers; electricity branch boxes, namely, junction boxes; electrical distribution boxes; electricity switch boxes; calibrated photovoltaic reference cells; solar cells for electricity generation, namely, silicon solar cell material for electricity generation incorporated into pavement materials; photovoltaic cells; electric circuits; electric couplings; electric collectors, namely, pantography being electric current collectors; solar energy collectors for electricity generation; electric and electronic components, namely, circuits, batteries, batteries, resistors, transistors, transformers, rectifiers; condensers, namely capacitors; ducts specially adapted for holding and spacing electricity conduits; electrical conductors; Geiger counters; water meters; electric meters; electric converters; electric commutator panels, namely, commutators; electric diodes; electric-current control devices, namely, electrical controllers for magnetic bearing control; electrical energy controllers, namely, electrical controlling devices; electric current and electric distributors for transformer substation use, namely electric relays, disconnecting switches, capacitor banks, lightning arresters, control panels, circuit breakers and busbars conductors, and conductors; nonlinear fiber-optics; electric switches; electricity indicators, namely, electronic indicator panels; electric loss indicators. namely, indicator lights for circuit boards; armatures, namely, electric coils; electronic inductors; photovoltaic installations for producing electricity in photovoltaic power plants, namely, photovoltaic solar panels for the production of electricity; electric circuit closers; photovoltaic inverters; electricity inverters; voltage limiters, namely, electricity limiters; instruction manuals in electronic format, namely, downloadable computer manuals for energy management; voltmeters; photovoltaic solar panels for the production of electricity; electric control panels for electricity; panels for electrical connections, namely, patch panels for housing electrical connectors; solar panels for the production of electricity; electric plugs; electrical extension cords; electric contact control panels; electric connection touch panels; electric plugboards; electric operation control panels; distribution boards, namely, electrical distribution boxes; electric reactors; voltage regulators for electrical energy; electric resistors; resistors for regulation of electric light fittings; fiber-optic instruments, namely receivers; electrical receptors in the nature of electric junction boxes; electric terminal boxes; electric thermostats; egg electric timers; electric voltage transformers; units in the nature of electrical energy; electric thermionic valve actuators; solar wafers; downloadable and recorded computer software for energy management and for managing electrical energy and renewable energy equipment; recorded computer operating programs, in particular in the field of energy management; inspection apparatus and instruments for energy management and, electrical energy renewable energy; control apparatus and instruments, namely, apparatus and instruments for controlling electric current; solar cells; solar module, namely, photovoltaic solar modules for production of electricityACTIVE—
039Renewable energy, electricity and biogas distribution; rental of apparatus for distributing and transmission of electricity; electricity distribution and storage services; electricity transport and storage services; services for the distribution, supply and transmission of energy; storage of electricity; distribution of electricity via cables; distribution of energy for heating and cooling buildings; distribution and supply of electricity; providing information regarding electricity distribution; storage of electrical machinery; rental of power lines to third parties for electricity transmission; consultancy services relating to the distribution of electricity; information and advisory services relating to energy distribution; supply of electricityACTIVE—
040Production of energy; electrical energy, renewable energy, green hydrogen and biogas generation and production services; processing services, purification and refining services for hot water and for solar, wind and biomass energy; treatment and transformation by mechanical or chemical processes for all kinds of fluids and waste; rental of electricity generating equipment; leasing of equipment for energy generation; rental of apparatus for transforming electricity, namely, rental of apparatus for generating electricity; electricity generation; rental of electricity generators; rental of air-conditioning apparatus; rental of equipment for generating electricity; rental of batteries; rental of heating boilers; rental of space heating apparatus; rental of electric transformers; generation of electricity from wind energy; generation of electrical energy from renewable energy sources; hydroelectric energy generation; production of energy generated by means of power plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 8, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 31, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 11, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 10, 2025FIMPFINAL DISPOSITION PROCESSED—
Mar 10, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 10, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Dec 10, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 9, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 23, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 23, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 8, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 8, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 18, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 5, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 5, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Sep 5, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 5, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 5, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 14, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 13, 2024RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Aug 13, 2024RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Aug 13, 2024RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Jul 4, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 4, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 4, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 27, 2024RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Jun 27, 2024RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Jun 27, 2024RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Jun 24, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 23, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 23, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 13, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 13, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 13, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 20, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 20, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 20, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 20, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 20, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 20, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 20, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 12, 2023RFNTREFUSAL PROCESSED BY IB—
Nov 21, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 21, 2023RFRRREFUSAL PROCESSED BY MPU—
Nov 17, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 17, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 15, 2023DOCKASSIGNED TO EXAMINER—
May 30, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
May 26, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 25, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance