USPTO serial 79370790
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrew D. Skale
Andrew D. Skale Mintz, Levin, Cohn, Ferris, Glovsky and Popeo, P.C3580 Carmel Mountain RoadSuite 300San Diego, CA 92130| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Formwork of metal, in particular wall and column formwork, namely, metal working platforms of formwork, and structural component metal parts and accessories of such formwork, namely, connecting parts being structural joint connectors of metal, working platforms being structures in the nature of metal platforms, support heads being metal brace supports, handles being metal handles, fasteners being metal threaded fasteners, and connectors of metal being structural joint connectors of metal, and encasing panel frames predominantly of metal to be used in connection with plywood panels. | ACTIVE | — |
| 037 | Construction consultancy in relation to formwork and formwork systems; repair and installation services in relation to formwork and formwork systems; construction, installation and repair services relating to formwork; assembly of formwork being assembly and disassembly of prefabricated panels of formwork; rental of formwork, parts and accessories for formwork and formwork systems, namely, slab and wall formwork panels, consisting of metal frames, plywood facelining, and plywood formlining, used in horizontal and vertical application; advisory services relating to the construction of buildings and other structures in the nature of bridges, single family housing, multilevel buildings, industrial buildings, utility buildings, cultural and educational buildings, dams, and tunnels, each in relation to formwork and formwork systems; providing online information relating to building construction in relation to formwork and formwork systems. | ACTIVE | — |
| 042 | Computer-aided advisory services relating to residential, commercial, industrial, cultural, educational, and infrastructural building design in relation to formwork and formwork systems; residential, commercial, industrial, cultural, educational, and infrastructural building design services in relation to formwork and formwork systems; computer-aided design services relating to residential, commercial, industrial, cultural, educational, and infrastructural building projects in relation to formwork and formwork systems; computer-aided engineering consultation services relating to architectural planning in relation to formwork and formwork systems; technical planning and consultancy, namely, engineering services and consultancy in relation to formwork and formwork systems; engineering and computer-aided engineering services in relation to formwork and formwork systems; providing temporary use of non-downloadable web-based software for construction drafting and calculations for use in engineering services, construction, and consultancy in relation to formwork and formwork systems; providing virtual computer systems through cloud computing in relation to formwork and formwork systems; cloud computing software for construction drafting and calculations for use in engineering services, construction, and consultancy in relation to formwork and formwork systems; rental of software for data processing in relation to formwork and formwork systems; software as a service (SaaS) featuring software for construction drafting and calculations for use in engineering services, construction, and consultancy in relation to formwork and formwork systems; construction drafting consultancy for the planning of construction projects in relation to formwork and formwork systems; planning of construction sites in relation to formwork and formwork systems, namely, construction drafting | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 22, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 28, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 27, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 24, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 24, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 24, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 19, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 3, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 3, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 3, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 3, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 3, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 15, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 15, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 15, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 19, 2023 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 27, 2023 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 27, 2023 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 22, 2023 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 21, 2023 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 16, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 16, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 16, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 16, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 16, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Oct 16, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Jun 9, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 5, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 1, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |