Drawing for VERTICAL SKY

USPTO serial 79371063

VERTICAL SKY

Reviewed by CopyMark Law Group

Reg. 7554135Status 700Registered
Filing date
Status date
Registration date
Nov 5, 2024
Examiner
BROWN, TINA
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with VERTICAL SKY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Bassam N. Ibrahim

Bassam N. Ibrahim Buchanan Ingersoll & Rooney, LP1737 King Street, Suite 500Alexandria, VA 22314United States

Goods and services

ClassDescriptionStatusFirst use
007Apparatus for wind power installations, namely, electricity generators and generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; structural and replacement parts and accessories for the aforementioned products, namely, rotor blades, blade stands, housings for wind turbines, machine beds, rotation devices in the nature of rotary pumps, rotary blowers, rotary compressors, rotary bearings and gears; machines and machine parts, namely, electric motors for machines, bearings, bearing housings, cylinders, valves, switches, brakes, clamping tools, rotary pumps, electric fans, ventilators and blowers for motors and engines for adjusting the angle of wings, brakes and braking devices, main shafts, constant velocity joints, clutches and electric generators for adjusting the angle of wings, brakes and braking devices, main shafts, constant velocity joints, clutches and electric generatorsACTIVE—
009Electronic equipment and computer equipment for windmills, wind power plants, wind turbines and other wind-operated machines as well wind-powered electricity generators and electric accumulators, namely, electronic integrated circuits, computer hardware, computer peripheral equipment, electric converters, power inverters and batteries; energy storage units, namely, supercapacitors for energy storage and ultracapacitors for energy storage; control and monitoring equipment, including devices for automatically turning generators on and off and for automatic start-up after a power cut, namely, electrical controllers, electric control panels, control units for regulating start-up of electrical motors, magnetic encoders, programmable logic controllers and video monitors; lightning conductors; microprocessors and microprocessor-based hardware systems consisting of computer hardware, in particular for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, control of the performance and thickness of brake linings, temperature, wind direction and wind speed; watt-hour meters; parts and accessories for the above-mentioned goods, namely, structural and replacement parts, battery chargers, electric cables and power connectors; downloadable and recorded software for operating, monitoring and automating wind power installations, namely, electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; downloadable and recorded software featuring algorithms for controlling wind power installations, namely, electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; downloadable and recorded software for machine learning, downloadable and recorded software using artificial intelligence for use in software development and machine learning; downloadable and recorded artificial intelligence and machine learning software for analysis; all the aforesaid products relating to windmills, wind power plants, wind turbines and other wind-operated machines as well as generators and energy storage systems, insofar as they relate to windmills, wind power plants, wind turbines and other wind-operated machinesACTIVE—
037Construction and assembly services relating to the installation of electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; installation, maintenance, servicing and repair of windmills, wind power plants, wind turbines and other wind-operated machines; advice and information services relating to the aforesaid servicesACTIVE—
042Engineering and technical support relating to windmills and wind power projects and studies, namely, technical consulting in the field of environmental engineering, technical advice relating to operation of computers, technical support services in the nature of troubleshooting of industrial process control computer software problems; conducting scientific feasibility studies, conducting scientific feasibility studies in the field of environmental engineering and technical project planning services, namely, engineering services, technical data analysis, namely, electric meter data analysis, system control data analysis in the nature of system performance and security analysis for ensuring proper functioning of windmills and for protecting data and meteorological data analysis for others, technical testing and measuring services as well as conducting scientific experiments, all the aforesaid services in the field of wind mill and wind power projects, namely, material testing, testing of computer software, product safety testing, environmental testing, testing the functionality of apparatus and instruments in the nature of wind power installations, namely electricity generators, generators for wind turbines, windmills, wind power plants in the nature of wind-powered electricity generators, wind turbines and other wind-operated machines, namely, wind-powered electricity generators; technical consultancy in the field of design and development of a combination of energy supply systems; design and development of systems for regenerative energy production; development and technical inspection of windmills, wind power plants, wind turbines and other wind-operated machines, and components thereof, for third parties; technical research projects for third parties in the field of windmills, wind power plants, wind turbines and other wind-operated machines, namely, product research, material research in the nature of scientific research relating to materials and research in the field of materials science, scientific research, research on electricity and research on environmental engineering; consultancy and information services concerning the aforementioned services; providing software as a service (SaaS) services featuring software for use in wind power plant operation; design, development, maintenance and updating of software; design, development, maintenance and updating of software for controlling, regulating and monitoring wind energy systems; development and testing of algorithms and software; all the aforesaid services relating to windmills, wind power plants, wind turbines and other wind-operated machines as well as to generators and energy storage systems, insofar as they relate to windmills, wind power plants, wind turbines and other wind-operated machinesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 21, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 21, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 21, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 21, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 21, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 26, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 8, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 8, 2025FIMPFINAL DISPOSITION PROCESSED—
Feb 5, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 17, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 5, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 5, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 29, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 29, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 20, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 20, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 31, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 17, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 17, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jul 17, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 17, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 17, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 9, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 9, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 9, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 2, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 2, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 2, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 25, 2023RFNPREFUSAL PROCESSED BY IB—
Oct 5, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 4, 2023RFRRREFUSAL PROCESSED BY MPU—
Sep 25, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 24, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2023DOCKASSIGNED TO EXAMINER—
Jun 6, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 2, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 1, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance