Drawing for NATUM

USPTO serial 79372470

NATUM

Reviewed by CopyMark Law Group

Reg. 7452281Status 700Registered
Filing date
Status date
Registration date
Jul 23, 2024
Examiner
RINKER, ANTHONY MICHAEL
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with NATUM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey D. Sanok

Jeffrey D. Sanok Crowell & Moring LLPP.O. Box 14300Washington, DC 20044-4300United States

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools for the cutting and forming of materials; casting machines; pressure casting machines; mechanical handling apparatus, namely, conveyor belts for use in the field of founding; industrial robots for use in casting technology; special automatic pressure casting machinesACTIVE—
008Manual material handling apparatus, namely, shovels for use in the die casting and founding fieldsACTIVE—
009Downloadable computer software for automation, operation and control of casting machines; downloadable computer software for automation, operation and control of pressure casting machines; electronic controllers for casting machines; electronic controllers for die-casting machines; manufacturing control systems comprised of electronic controllers for casting machines, downloadable operating system software and downloadable computer software for networking, processing and data analysis for use in manufacturing using casting and founding technology; manufacturing control systems comprised of electronic controllers for moulding machines, downloadable operating system software and downloadable computer software for networking, processing and data analysis in intelligent manufacturing foundries; industrial automation controls; downloadable industrial automation software, namely, software to integrate manufacturing machine operations, track problems, and generate production reports; downloadable computer software to automate data warehousing; smart manufacturing system controls, namely, computer hardware and downloadable smart manufacturing software to monitor and control factory manufacturing processes; downloadable computer operating systems; downloadable operating system programs; data acquisition instruments for casting technology, namely, sensors for measuring temperature and pressureACTIVE—
042Scientific and technological services, namely, scientific research, analysis, and testing in the field of founding; software development, programming and implementation, computer hardware development, for use in the field of founding; technological analysis services in the field of founding; scientific analysis in the field of founding; computer aided scientific analysis services in the field of founding; technical data analysis services in the field of founding; industrial analysis in the field of founding utilizing data acquisition and data evaluation methodsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 1, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 15, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 15, 2025FIMPFINAL DISPOSITION PROCESSED—
Oct 24, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 23, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jul 23, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 8, 2024GPNXNOTIFICATION PROCESSED BY IB—
May 7, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 7, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 17, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 17, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 17, 2024OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 3, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 27, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 27, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 27, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 11, 2023RFNTREFUSAL PROCESSED BY IB—
Sep 20, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 20, 2023RFRRREFUSAL PROCESSED BY MPU—
Sep 1, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 31, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2023DOCKASSIGNED TO EXAMINER—
Jun 27, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 23, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 22, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance