Drawing for ECCU

USPTO serial 79372949

ECCU

Reviewed by CopyMark Law Group

Reg. 7490710Status 700Registered
Filing date
Status date
Registration date
Sep 3, 2024
Examiner
LAVACHE, LINDA M
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ECCU?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Scott S. Havlick

Scott S. Havlick Holland & Hart LLPPO Box 8749Trademark DocketingDenver, CO 80201

Goods and services

ClassDescriptionStatusFirst use
007Generators, namely, electricity generators; pumps for machines; hydraulic turbines, other than for land vehicles; wind turbines; disintegrators for chemical processing; conveyors being machines; heat exchangers being parts of machines; steam turbines, other than for land vehicles; gas turbines, not for land vehicles; all of the foregoing goods being for use in the energy industry and in connection with energy generating plants; power plant components, namely, electricity generators, air-cooled condensers, electrolysis machines for generating hydrogen, electrolysis machines for generating hydrogen and gas/hydrogen mixtures, and machine systems and subsystems for the production of energy, especially in the form of hydrogen, comprised of electrolysis machines for generating hydrogen obtained from alternative energy sourcesACTIVE—
040Processing of fuels; emission-processing services, namely, carbon capture for others; waste treatment services; refining of fuels; production and treatment of fuels for others; production of energy; production of hydrogen and hydrogen processing services; production of methane and methane processing services; production of electricity; production of heat by means of electricity generation for energy use; combined production of electricity and heat; consultancy in relation to the aforesaid services; capture and treatment of carbon dioxide for othersACTIVE—
042Scientific and technological services and research and design relating thereto, namely, scientific and technological research and new product design, all in the fields of producing and processing fuels, energy, hydrogen, methane, electricity and heat; industrial analysis and research services in the field of energy generation technology; design and development of computer hardware and software; technical monitoring services, namely, remote monitoring of equipment for producing and processing fuels, energy, hydrogen, methane, electricity and heat to ensure proper functioning; energy auditing; inspection of power generation, storage, and distribution apparatus and machinery for quality control purposes; engineering consultancy; engineering services for power plants and industrial production facilities; information, consultancy and advisory services relating to engineering services in the field of energy efficiency; technical supervision services, namely, computer project management services; remote monitoring of power plants to ensure proper functioning; design services, namely, design of new products for others; hosting of computer websites; computer analysis and consulting services in the field of computer programs and computer software; design and testing of process automation equipment systems and computer hardware and software systems related thereto; computer modelling and computer simulation of power plants and processes; development, updating and maintenance of software and database systems; maintenance of database software systemsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Sep 3, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 18, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 18, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 29, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 16, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 16, 2024XAECEXAMINER'S AMENDMENT ENTERED—
May 16, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 16, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
May 16, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 29, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 29, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 29, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 4, 2024RFNTREFUSAL PROCESSED BY IB—
Feb 27, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 27, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 27, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 12, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 12, 2024RFRRREFUSAL PROCESSED BY MPU—
Jan 25, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 24, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 17, 2024DOCKASSIGNED TO EXAMINER—
Jul 7, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 3, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 29, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance