Drawing for UKONN-X

USPTO serial 79373882

UKONN-X

Reviewed by CopyMark Law Group

Reg. 7561474Status 700Registered
Filing date
Status date
Registration date
Nov 12, 2024
Examiner
MALYSZEK, KIMBERLY RAY
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with UKONN-X?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John Zaccaria

John Zaccaria Notaro, Michalos & Zaccaria P.C.100 Dutch Hill Road, Suite 240Orangeburg, NY 10962United States

Goods and services

ClassDescriptionStatusFirst use
009Electric adapter connectors; electric plugs; remote control electric sockets; bus interfaces for computers; electric cables and wires; electric interface cables; measuring, detecting, monitoring and controlling devices, namely, electrical controlling devices for industrial automation and plant construction; internet of things (IoT) sensors for industrial automation and plant construction; switches, electric; computer networking hardware; Internet of Things (IoT) gateway routers; interfaces for computers; ethernet switches; electric installations for the remote control of industrial operations; testing and quality control devices, namely, sensing and signaling devices for measurement and quality control of materials for industrial automation and plant construction; optical scanners; smartglasses; data gloves; downloadable computer software for remote monitoring and analysis for industrial automation and plant constructionACTIVE—
035Data processing services; systematization of data in computer databases; data management, namely, data compiling and analyzing relating to business management in the field of industrial automation and plant construction; business management consultancy; administrative support and data processing services; statistical analysis and reporting services for business purposes in the fields of industrial automation and plant constructionACTIVE—
037Installation, repair and maintenance of machines and plant construction machinery; laying of cable; installation of computer instrumentation systems for use in industrial automationACTIVE—
042Engineering and computer-aided engineering services for industrial automation and plant construction; troubleshooting in the nature of diagnosing computer hardware and software problems; creation of control programs for automated measurement, assembly, adjustment, and related visualization for industrial automation and plant constructionACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 30, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 3, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 11, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 11, 2025FIMPFINAL DISPOSITION PROCESSED—
Feb 12, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 28, 2024OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 11, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 11, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 12, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 12, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 27, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 27, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 7, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 23, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 23, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jul 23, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 23, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 23, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 16, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 16, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 16, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 16, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 16, 2024ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Jul 16, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 16, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 16, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 16, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 21, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 14, 2024RFNTREFUSAL PROCESSED BY IB—
Jan 20, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 20, 2024RFRRREFUSAL PROCESSED BY MPU—
Jan 4, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 3, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2024DOCKASSIGNED TO EXAMINER—
Sep 30, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 1, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 27, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 21, 2023LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Jul 13, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance