Drawing for ÇALISKAN

USPTO serial 79374002

ÇALISKAN

Reviewed by CopyMark Law Group

Reg. 7717657Status 700Registered
Filing date
Status date
Registration date
Mar 11, 2025
Examiner
ANGOTTI, SALVATORE JOHN
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ÇALISKAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew T. Rissler

Andrew T. Rissler Patel & Almeida, P. C.20700 Ventura Blvd., Suite #235Woodland Hills, CA 91364United States

Goods and services

ClassDescriptionStatusFirst use
011Lighting installations; lights for vehicles and interior-exterior spaces; heating installations using solid, liquid or gas fuels or electricity; central heating boilers; boilers for heating installations; radiators for heating; heat exchangers, not parts of machines; stoves; kitchen stoves; solar thermal collectors for heating; steam, gas and fog generators, namely, steam generators for domestic use, steam generators for use with steam baths, gas generation plants for industrial purposes; steam boilers, other than parts of machines; acetylene generators; oxygen generators, namely, oxygen generators for industrial purposes; nitrogen generators, namely, nitrogen generators for industrial purposes; installations for air-conditioning and ventilating; cooling installations and freezers; electric and gas-powered devices; installations and apparatus for cooking, drying and boiling; cookers; electric cooking pots; electric water heaters; barbecues; electric laundry driers; hair driers; hand drying apparatus; sanitary installations; taps being faucets; shower installations; toilets being water closets; shower and bath cubicles; bath tubs; toilet seats; sinks; wash-hand basins being parts of sanitary installations; washers for water taps; valves being parts for sanitary installations; water softening apparatus; water purification apparatus; water purification installations; waste water purification installations; electric bed warmers and electric blankets, not for medical use; electric pillow warmers; electric or non-electric footwarmers; hot water bottles; electrically heated socks; filters for aquariums and aquarium filtration apparatus; industrial type installations for cooking, drying and cooling purposes; pasteurizers and sterilizers; iron melting furnacesACTIVE—
021Ironing boards and shaped covers therefor, drying racks for washing, clothes drying hangers; non-electric cooking and heating utensils, namely, non-electric cookers, non-electric heaters, grills, barbecuesACTIVE—
035The bringing together, for the benefit of others of lighting installations, lights for vehicles and interior-exterior spaces, heating installations using solid, liquid or gas fuels or electricity, central heating boilers, boilers for heating installations, radiators for heating, heat exchangers, not parts of machines, stoves, kitchen stoves, solar thermal collectors for heating, steam, gas and fog generators, namely, steam generators for domestic use, steam generators for use with steam baths, gas generation plants for industrial purposes, steam boilers, other than parts of machines, acetylene generators, oxygen generators, namely, oxygen generators for industrial purposes, nitrogen generators, namely, nitrogen generators for industrial purposes, installations for air-conditioning and ventilating, cooling installations and freezers, electric and gas-powered devices, installations and apparatus for cooking, drying and boiling, cookers, electric cooking pots, electric water heaters, barbecues, electric laundry driers, hair driers, hand drying apparatus, sanitary installations, taps being faucets, shower installations, toilets being water closets, shower and bath cubicles, bath tubs, toilet seats, sinks, wash-hand basins being parts of sanitary installations, washers for water taps, valves being parts for sanitary installations, water softening apparatus, water purification apparatus, water purification installations, waste water purification installations, electric bed warmers and electric blankets, not for medical use, electric pillow warmers, electric or non-electric footwarmers, hot water bottles, electrically heated socks, filters for aquariums and aquarium filtration apparatus, industrial type installations for cooking, drying and cooling purposes, pasteurizers and sterilizers, iron melting furnaces, ironing boards and shaped covers therefor, drying racks for washing, clothes drying hangers, non-electric cooking and heating utensils, namely, non-electric cookers, non-electric heaters, grills, barbecues, enabling customers to conveniently view and purchase those goods, such services may be provided by retail stores, wholesale outlets, by means of electronic media or through mail order cataloguesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 15, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 22, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Sep 22, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Jun 11, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 11, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Mar 11, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 20, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 21, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 21, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 15, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 4, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 31, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 18, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 12, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 11, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Dec 11, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 11, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 11, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 20, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 19, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 19, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 4, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 4, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 24, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 24, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 23, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Jul 23, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 23, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 23, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 27, 2024RFNTREFUSAL PROCESSED BY IB—
Jan 24, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 24, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 24, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2023TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 11, 2023CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 11, 2023TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 13, 2023RFNTREFUSAL PROCESSED BY IB—
Oct 24, 2023RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 24, 2023RFRRREFUSAL PROCESSED BY MPU—
Oct 12, 2023RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 11, 2023CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 25, 2023DOCKASSIGNED TO EXAMINER—
Jul 18, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 14, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 13, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance