USPTO serial 79374999
SIGG
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- O'BRIEN, JENNIFER LYNN
- Law office
- TMO LAW OFFICE 121
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with SIGG?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Inverters (electricity); batteries (cells); electric converters; solar panels for electricity production; battery chargers; electrical condensers capacitors; current rectifiers; electric relays; converters for electric plugs; ionization apparatus not for the treatment of air or water | ACTIVE | — |
| 011 | Apparatus and installations for lighting; portable electric radiators; thermal-conversion solar collectors [heating]; heat-accumulating stoves; electric fans for personal use; electric hot-water bottles; refrigeration installations and machines; heating apparatus; sanitary apparatus and installations; ionization apparatus for the treatment of air or water | ACTIVE | — |
| 037 | Electric appliance installation and repair; Machinery installation, maintenance and repair; provision of information with respect to repair and maintenance related to the aforesaid goods; heating equipment installation and repair; interference suppression in electrical apparatus; vehicle battery charging; rustproofing; maintenance of power lines; construction services; installation and maintenance of photovoltaic installations | ACTIVE | — |
| 042 | Consultancy in the field of energy-saving; Research in the field of environmental protection; technical research; quality control; chemical research; material testing; industrial design services; computer programming; graphic arts design services; architectural services | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 14, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 10, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 22, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 19, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 19, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 6, 2024 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Sep 6, 2024 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 27, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 6, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 6, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 20, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 19, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 2, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 31, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 6, 2023 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Oct 22, 2023 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jul 28, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 24, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 20, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |