Drawing for REMAGIN

USPTO serial 79375239

REMAGIN

Reviewed by CopyMark Law Group

Reg. 7567580Status 700Registered
Filing date
Status date
Registration date
Nov 19, 2024
Examiner
XU, ELAINE YILIN
Law office
TMO LAW OFFICE 127

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with REMAGIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Angela Alvarez Sujek

Angela Alvarez Sujek Bodman PLC201 South Division Street, Suite 400Ann Arbor, MI 48104United States

Goods and services

ClassDescriptionStatusFirst use
006Ready made metal building components, namely, construction elements made of metal being fabricated metal components for building loadbearing superstructures; steel building materials, namely, steel frames for building; steel frames for building; structural frames of metal for building; stud rails of metal for flats; space frames of metal for building; modular prefabricated steel framing for building; modular portable building units of metal, namely, metal modular portable homes; metal modular portable building structures, namely, modular external building envelopes to roofs and external walls of metal that is portable; modular metallic structures, namely, metal modular homes; metal modular building units, namely, modular metallic buildings; metal materials for construction, namely, metal piles; metal materials for building and construction, namely, steel angles for use in building construction, metal blocks for building; prefabricated metal framed buildings; ironmongery of metal for building, namely, metal latches and hinges for buildings; frameworks of metal, namely, framework of metal for building; framework of metal for building; frames of metal for buildingACTIVE—
019Structures being portable building and transportable buildings, not of metal; building and construction materials and elements, not of metal, in the nature of gypsum and calcium silicate building materials, non-metal materials for constructing floors, walls and ceilings; prefabricated buildings, not of metal, transportable buildings, not of metal; building timber; non-metallic civil engineering structures, for building and construction, namely, engineered pre-assembled frames for building and engineered pre-assembled door, window, and cold frames for construction; non-metallic frames being nonmetal framework for building for use with partitions; framework, not of metal, for building; non-metallic modular building units, namely, non-metal modular homes comprised of wood; modular homes, not of metal; non-metallic modular units being modular nonmetal structures with a pre-assembled frame for public sector for constructing prefabricated buildings; prefabricated houses kits, not of metal, comprised primarily of non-metal modular homes and also including modular pre-assembled frames not of metal for building; prefabricated non-metal buildings; structural frameworks, not of metal, for buildings; transportable buildings of timber; gypsum for use as building materials; intumescent building materials, namely, fire resisting plasterboard; fiberboard being building materials; building and construction materials and elements in the nature of sheathing made of wood and artificial wood; drywall; gypsum boards for construction purposes; fibre cement; sheathing boards, not of metal; roofing materials being roof boards of wood and insulation not of metal, in the nature of non-metal building panels incorporating acoustic insulation for building purpose; non-metallic cladding materials being non-metal cladding for building; non-metallic flooring in the nature of non-metallic floor boards being a type of building material and non-metal floor panels incorporating acoustic insulation; ceilings, not of metal; non-metallic wall panelsACTIVE—
037Advisory services relating to the construction of buildings and other structures; building construction advisory services; building construction consultancy; construction consultancy; construction information; building construction services, namely, construction works for prefabricated houses; consultancy and information services relating to construction; consultancy relating to residential and building construction; consultancy, information and advisory services relating to the construction of public works; information services relating to the construction of buildings; installation of prefabricated building elements; providing information relating to building construction; providing information relating to building reconstruction; providing online information relating to building constructionACTIVE—
042Advisory services relating to building design; advisory services relating to design engineering; computer aided design services relating to building projects; computer assisted engineering design services; computer-aided engineering design services; computer-aided engineering design and drawing services; consultancy in the field of construction drafting; construction drafting; design of residential buildings; design of engineered building systems; design services for architecture; design services relating to architecture; design services relating to civil engineering; engineering and computer-aided engineering servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 13, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 13, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 13, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 3, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 15, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 15, 2025FIMPFINAL DISPOSITION PROCESSED—
Feb 19, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 10, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 25, 2024OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 25, 2024OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 19, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 19, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 3, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 3, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 14, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 30, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 30, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Jul 30, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 30, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 30, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 26, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 26, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 26, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 5, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 5, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 5, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 31, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 31, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 31, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 23, 2024RFNPREFUSAL PROCESSED BY IB—
Apr 2, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 1, 2024RFRRREFUSAL PROCESSED BY MPU—
Mar 15, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 14, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2024DOCKASSIGNED TO EXAMINER—
Oct 2, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 2, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 2, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 2, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Oct 2, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 1, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 28, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 27, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance