USPTO serial 79375272
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Shoko Naruo
Shoko Naruo Thompson Coburn LLPOne US Bank PlazaSt. Louis, MO 63101United States| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; common metals, unwrought or semi-wrought, and their alloys; copper, aluminium and their alloys; building materials of metal; pipe fittings and forgings, of the following materials, namely, pipe fittings of copper, aluminium, copper alloys, aluminium and its alloys, steel forgings, unwrought and semi-wrought copper; unwrought and semi-wrought aluminium; copper alloys; aluminium and its alloys; semi-wrought common metals; shaped parts of metal in the form of semi-finished products, namely, castings, foils, powder, and rolled, drawn or extruded semi-finished articles of common metals or its alloys; metallic casting moulds of metal; transportable buildings of copper, aluminium and their alloys; non-electric cables and wires of common metal; metal poles and profiles made of common metals and their alloys, not for electric purposes; pipes and tubes of metal; pipes of copper, aluminium, stainless steel, copper alloys, aluminium and its alloys, stainless steel alloys; insulated pipes of metal; Manifolds of metal for pipelines, namely pipe bundles; pipe connectors of metal; metal valves not being parts of machines; metal fittings for pipes; heat-insulated copper pipes; pipe bundles of copper, aluminium, stainless steel, copper alloys, aluminium and its alloys, stainless steel alloys | ACTIVE | — |
| 007 | Milling machines; * machine parts, namely, * pipes and pipelines of copper, aluminium [ and their ] alloys [ being parts of machines ] * made from the aforesaid materials * ; structural and replacement parts of machines and installations for continuous casting; forging molds being parts of machines; casting moulds of metal being parts of machines; moulds being parts of machines for forging metal products; chill moulds being machine parts; machine parts, namely, mould plates; casting wheels being parts of machines * ; all the aforesaid goods other than mechanical apparatus for filtering and sieving water and other liquids and parts therefor and their fittings * | ACTIVE | — |
| 009 | Electrical bare wires; Electronic components, namely plug-in block connectors, relays and integrated circuits; electrodes; electrical cables; power cables | ACTIVE | — |
| 011 | Pipes and tubes of metal and plastic being parts of installations for heating, cooling and sanitary purposes; heat accumulators; heat exchangers, other than parts of machines; parts for water-supplying systems, heat exchangers and hot water installations, and sanitary installations, namely, rods, pipes, tube bundles; all the aforesaid goods excluding wall heating systems * ; all the aforesaid goods other than wall heating systems, apparatus and instruments for purifying and filtering water and other liquids and parts therefor and their fittings * | ACTIVE | — |
| 017 | Plastics in extruded form for use in further manufacture; flexible pipes of plastic; flexible pipes of plastic and flexible pipe bundles of plastic materials; flexible plastic coated ducts in the field of pneumatic and hydraulic applications; nonmetal flexible ducts, tubes, pipes and pipe bundles in the field of pneumatic and hydraulic applications; structural parts for all the aforesaid articles made of plastics, namely, connectors, couplings and joints, other than of metal, for pipes, plastic-coated line pipes and tube bundles; fittings, not of metal, for flexible pipes | ACTIVE | — |
| 037 | Installation, assembly, maintenance and repair of parts of machines, namely moulds; installation, assembly, maintenance and repair in connection with moulding machines for casting of metal and metal alloys; laying and installation, in the field of pipes and pipework; maintenance and repair of parts of machines, being moulds | ACTIVE | — |
| 040 | Machining of metals, namely, metal casting; blacksmithing; rotogravure; metal casting; metal stamping; metal pressing, namely, metal plating and metal polishing; polishing of metals; metallizing; recycling services; finishing of metals for others; heat coating of metals; heat treatment of materials of copper, aluminium and alloys thereof | ACTIVE | — |
| 042 | Scientific research and design services; technological research and design services; design of moulds; Computer aided design of moulds; engineering and design, in the field of installations and installation parts and tools for heat recovery and heat transport, machinery and machine parts; construction drafting; engineering services; technological consultancy and preparation of reports relating to technical research in the field of mold design, development of new casting techniques, molds, casting technology, technical advice on copper semi-finished products, renewable energies such as heat recovery; technological consultancy and preparation of reports relating to technological research in the field of mold design, development of new casting techniques, molds, casting technology, technical advice on copper semi-finished products, renewable energies such as heat recovery; technical project studies in the field of mold design, development of new casting techniques, molds, casting technology, technical advice on copper semi-finished products, renewable energies such as heat recovery; research and development for others with regard to new products; engineering and design in the field of casting moulds, metal articles and goods made from metal alloys; technological consultancy in the field of semifinished products of copper, aluminium and alloys thereof; design of installations for heat recovery and heat transport, moulds for casting, and for the manufacture and processing of goods of metal and metal alloys | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 13, 2026 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Oct 7, 2026 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| May 16, 2025 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| May 9, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 23, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 23, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 23, 2025 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Feb 26, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 10, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 10, 2025 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Dec 25, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 25, 2024 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 26, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Nov 26, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 24, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 24, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 4, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 19, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 19, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 19, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 19, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 19, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 6, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 6, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 6, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 5, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 5, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Aug 5, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 5, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 5, 2024 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Aug 5, 2024 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 27, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 4, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 4, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 10, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 9, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 7, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 28, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 27, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |