Drawing for SCHNELL

USPTO serial 79375673

SCHNELL

Reviewed by CopyMark Law Group

Reg. 7734219Status 700Registered
Filing date
Status date
Registration date
Mar 25, 2025
Examiner
VAGHANI, MAYUR C
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with SCHNELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James J. Bitetto

James J. Bitetto Tutunjian & Bitetto, P.C.401 Broadhollow Road, Suite 402Melville, NY 11747United States

Goods and services

ClassDescriptionStatusFirst use
007Wrapping machines; planing machines; straightening machines, namely, metalworking machines for straightening metals; material handling machines, namely, lifting machines for metal bars, cranes, robotic centres in the nature of industrial robots, chain, band or roller conveyors being machines; automatic bending benches being bending machines; automatic feeders, namely, metal wire drawing machines, robotic arms in the nature of industrial robots in arm form, chain, band or roller conveyors being machines; automatic bar and bundle feeders,  namely, metal bar drawing machines, robotic arms in the nature of industrial robots in arm form, chain, band or roller conveyors being machines; mechanical electric, hydraulic or pneumatic shears; assembling machines, namely, mesh and wire welding machines and binding machines for industrial use, cagemaking machines, namely, stirrup assembling machines, cutting machines and bending machines, as well as parts and accessories in the nature of bending heads, drawing devices, straightening devices, and shearing devices for all the aforesaid machines; combined shearing and bending machines; combined machines for processing bars, namely, straightening and bending machines, shearing and welding machines; lifting machines, namely, bar lifting machines, coils lifting machines; machines and machine tools, in particular, machines for processing bars for reinforced concrete; concrete processing machine; nozzles for concrete extrusion construction machines; binding machines, namely, wire binding machines; metal working machines; wire processing machines; machines for the production of spacers; machines for making bindings; machines for the production of panels composed of insulating material and reinforcement; machines, namely, rods storing machines and bar manipulator machines for the storage and selective picking of metal bars in material handling machines during the metalworking process; machines for straightening and bending steel bars; shaping machines for metalworking; electric welding machines; parts of rebar structural placement machines, namely, automated jigs for holding a component during machining; mesh bending machines; iron presses, namely, hydraulic, mechanical, pneumatic and electric presses; industrial and custom industrial robots for processing and handling metals, in particular rebars, iron reinforcements for reinforced concrete and mesh; stirrup machines, namely, wire bending machines; mesh cutting machines; lathes; motorized conveyors, in particular, belt and roller conveyors; mechanical, electric, hydraulic and pneumatic miter saws for cutting bars.ACTIVE—
009Downloadable computer firmware for use in productivity monitoring and/or optimization in metalworking centres, use for connecting production machines, and for controlling metal working machines; downloadable software for monitoring and/or optimizing productivity of metal working machines; downloadable computer software for data processing for monitoring and/or optimizing productivity of metal working machines; computer, programmable logic controllers (PLC), hardware sensors and detectors, in particular, sensors for measuring distances and movement detectors for use with machine tools; downloadable software for use in the construction industry for product design, production control, raw material control, logistics and management in metalworking centers, downloadable business management software; downloadable software for the creation, design and construction of bars, rods, mesh, floors, walls and reinforcement for the construction industry; downloadable industrial process management software; downloadable software for the optimization of industrial processes.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 24, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 2, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 2, 2025FIMPFINAL DISPOSITION PROCESSED—
Jun 25, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 25, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Mar 25, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 4, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 4, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 29, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 17, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 14, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 14, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Jan 14, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 14, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 14, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 1, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 1, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 29, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 29, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 29, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 19, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 19, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 19, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 23, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 23, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 23, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 19, 2024RFNTREFUSAL PROCESSED BY IB—
Feb 29, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 29, 2024RFRRREFUSAL PROCESSED BY MPU—
Feb 8, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 7, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 6, 2024RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Jan 20, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 19, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 18, 2024DOCKASSIGNED TO EXAMINER—
Aug 8, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 4, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 3, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance