USPTO serial 79377092
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kevin M. Bovard
Kevin M. Bovard Baker & Hostetler LLP1735 Market Street Suite 3300Philadelphia, PA 19103-7501United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Road Construction machines; construction machines for waste, asphalt and soil compaction; road rollers, trench road rollers, tandem road rollers and single-drum road rollers; road making machines; road rolling machines; tamping rams being road construction machines; construction machines, namely, vibrating plates being road construction machines; construction machines, namely, vibrating compactor plates being road construction machines; landfill waste compactors; landfill construction machines in the nature of waste compactors; earth-moving machines; autonomous rollers, especially, autonomous road rollers, autonomous trench road rollers, autonomous tandem road rollers, autonomous single drum road rollers; autonomous road making machines; autonomous rammers being road construction machines; construction machines, namely, autonomous vibrating plates being road construction machines; construction machines, namely, autonomous vibratory plates being road construction machines; construction machines, namely, autonomous compacters for soil, asphalt and waste, autonomous machines for landfill sites being autonomous waste compactors, autonomous earth moving machines; compressing machines; ground surface finishing and compacting machines; structural parts and fittings for all the aforesaid goods | ACTIVE | — |
| 009 | Electronic control apparatus for measuring asphalt and soil compaction; event recorders being electronic data recorders; recorded and downloadable software for measuring asphalt and soil compaction; recorded and downloadable software for measuring compaction progress; recorded and downloadable software for the evaluation of compaction measurement values; recorded and downloadable software for measuring and displaying the stiffness, level of compaction, load- bearing capacity and temperature of subsurfaces, in particular of road surfaces and the soil; downloadable computer programs and mobile apps for the efficiency and status monitoring of machines, mechanical tools and equipment for construction | ACTIVE | — |
| 042 | Measurement evaluation services in the field of construction machines; technical project studies, namely, conducting feasibility studies in the field of mechanical engineering; road building design services; research in the field of building construction; engineering project management services | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 22, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 8, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 31, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 31, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 22, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 22, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 7, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 6, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Aug 6, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 21, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 21, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 1, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 18, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 18, 2024 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 18, 2024 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 18, 2024 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 18, 2024 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 5, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 4, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 4, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 22, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 22, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 22, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 14, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 14, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 14, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 6, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 16, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 16, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 2, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 1, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 13, 2023 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 20, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 29, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 25, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 24, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |