Drawing for EVIB

USPTO serial 79377092

EVIB

Reviewed by CopyMark Law Group

Reg. 7464699Status 700Registered
Filing date
Status date
Registration date
Aug 6, 2024
Examiner
GULIANO, ROBERT N
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with EVIB?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin M. Bovard

Kevin M. Bovard Baker & Hostetler LLP1735 Market Street Suite 3300Philadelphia, PA 19103-7501United States

Goods and services

ClassDescriptionStatusFirst use
007Road Construction machines; construction machines for waste, asphalt and soil compaction; road rollers, trench road rollers, tandem road rollers and single-drum road rollers; road making machines; road rolling machines; tamping rams being road construction machines; construction machines, namely, vibrating plates being road construction machines; construction machines, namely, vibrating compactor plates being road construction machines; landfill waste compactors; landfill construction machines in the nature of waste compactors; earth-moving machines; autonomous rollers, especially, autonomous road rollers, autonomous trench road rollers, autonomous tandem road rollers, autonomous single drum road rollers; autonomous road making machines; autonomous rammers being road construction machines; construction machines, namely, autonomous vibrating plates being road construction machines; construction machines, namely, autonomous vibratory plates being road construction machines; construction machines, namely, autonomous compacters for soil, asphalt and waste, autonomous machines for landfill sites being autonomous waste compactors, autonomous earth moving machines; compressing machines; ground surface finishing and compacting machines; structural parts and fittings for all the aforesaid goodsACTIVE—
009Electronic control apparatus for measuring asphalt and soil compaction; event recorders being electronic data recorders; recorded and downloadable software for measuring asphalt and soil compaction; recorded and downloadable software for measuring compaction progress; recorded and downloadable software for the evaluation of compaction measurement values; recorded and downloadable software for measuring and displaying the stiffness, level of compaction, load- bearing capacity and temperature of subsurfaces, in particular of road surfaces and the soil; downloadable computer programs and mobile apps for the efficiency and status monitoring of machines, mechanical tools and equipment for constructionACTIVE—
042Measurement evaluation services in the field of construction machines; technical project studies, namely, conducting feasibility studies in the field of mechanical engineering; road building design services; research in the field of building construction; engineering project management servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 22, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 8, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 31, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 31, 2025FIMPFINAL DISPOSITION PROCESSED—
Jan 22, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 22, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 7, 2024FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 6, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 6, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 21, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 1, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 18, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 18, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Apr 18, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 18, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 18, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 5, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 4, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 4, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 22, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 22, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 22, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 16, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 14, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 14, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 14, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 6, 2024RFNTREFUSAL PROCESSED BY IB—
Jan 16, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 16, 2024RFRRREFUSAL PROCESSED BY MPU—
Jan 2, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 1, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2023DOCKASSIGNED TO EXAMINER—
Oct 20, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 29, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 25, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 24, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance