Drawing for MIDAR

USPTO serial 79377152

MIDAR

Reviewed by CopyMark Law Group

Reg. 7636675Status 700Registered
Filing date
Status date
Registration date
Jan 7, 2025
Examiner
JOHNSON, AISHA CLARKE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with MIDAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephen Jadie Coates

Stephen Jadie Coates Coates IP LLP3213 W Wheeler St. #362Attn: TrademarksSeattle, WA 98199

Goods and services

ClassDescriptionStatusFirst use
001Geopolymer matrix composite materials and preparations for use in manufacture; alkali-activated geopolymer and non-sintered ceramics for use in the manufacture of products which have undergone encapsulation or immobilisation; geopolymer matrix composites for use in the manufacture of heat shields and insulation productsACTIVE—
019Non-metallic building materials namely geopolymer panels, floor boards and fascia; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; non-metallic monuments; non-metallic framed conservatories, doors and windows; geotextiles; non-metallic waterproofing materials for building and construction, namely polymer and geopolymer coatings for building materials; bricks; natural and artificial stone, cement, lime building materials, mortar for building, plaster, gravel; asphalt, pitch, bitumen and preparations made from these materials other than paints for use in building and construction; non-metallic boards for use in buildings; wall boards, not of metal; boards, not of metal for use in building and construction; cement; building materials made of plaster; plaster and plaster compositions for use in building construction; non-metallic partitioning and non-metallic partitioning materials for building; non-metallic partitions for building; parts, fittings and accessories for all the aforesaid goods; but not including pipes, tubes, couplings, joints for all the aforesaid goods; non-metallic mouldings for building; timber mouldings for building; non-metallic building materials formed by the process of extrusion; non-metallic partition installations; non-metallic ceiling installations; non-metallic ceiling panels; non-metallic wall claddings; non-metallic wall panels; timber wall panels; non-metallic doors; timber doors; non-metallic glazing units; non-metallic glazing panels; glass for use in buildings; printed glass for use in buildings; routed glass for use in buildings; etched glass for use in buildings; architectural glass elements; architectural glass installations; temporary building structures in the form of non-metallic exhibition stands; non-luminous, non-mechanical signs not of metal; non-luminous, non-mechanical signs of wood; non-luminous, non-mechanical signs of plastic; flat roofs, not of metal, in particular flat sealings, namely bitumen webs, liquid sealings, plastic sealings; flat roof fittings, not of metal, in particular dome lights and fittings, roof edging systems, covers for terraces; wood, namely construction timber, lumber, profiled wood, boards of wood; facades, not of metal, in particular facade claddings, including slate, fibre cement, hardboard, plastic components; roof coverings, not of metal, in particular clay roof tiles, concrete roofing tiles, slate, fibre cement, double web panels, bitumen; roofing materials, not of metal; guttering, not of metal, in particular gutters, down pipes; fittings, not of metal, for high pitched roofs, in particular underfloor webs, insulating membranes, attic stairs; green roofs, not of metal; monuments, not of metal; doors and windows, not of metal; floors, not of metal; roofs and roofing materials not of metal; non-metallic tiles; natural and artificial stone, cement, lime, mortar, plaster and gravel; asphalt, pitch, bitumen and preparations made from these materials other than paints for use in building and construction non-metallic boards for use in buildings; polymer and geopolymer internal walls, ceilings and partitions; non-metallic roofing materials; non-metallic building materials having insulation properties namely geopolymer panels, floor boards and fascia; PVCU roofing products, fascias, guttering, down pipes, cladding; internal partitioning made of non-metallic materials; non-metal partitioning materials for building; non-metal blocks for use in flooring construction; ceramic tiles for flooring and facing; ceramic tiles for flooring and lining; ceramic tiles for flooring of building; flooring made of wood; non-metal flooring materials; non-metal flooring; non-metal flooring tiles; hardwood flooring; synthetic flooring materials or wall-claddings; tile floorings, not of metal; wooden flooring; fillers for repairing walls in the nature of cement; rendering compositions for use in building; rendering compositions for use in construction; protective sealing coatings for construction purposes; erosion control fabric, mats and sheeting, not of metal; fabrics for use in civil engineering; geotextiles for soil stabilisation for use in construction; erosion control fabric; erosion control sheeting or fabric for construction use; non-metal tree guards in the nature of temporary structures; non-metal pavers; pavers; synthetic pavers; non-metal lawn guards in the nature of temporary structures; non-woven fabrics for land stabilisation; non-woven fabrics for soil stabilisation; non-metal stabilisation fabrics for use in construction; non-metal waterproofing boards; non-metal drainage installations; non-woven fabrics for land drainage; building boards of plastics materials; building materials of plastics material; construction elements of plastic namely composite blocks, boards, panels, pipe supports; expanded plastics for use in construction namely composite blocks, boards, panels, pipe supports; expanded plastics for use in building namely composite blocks, boards, panels, pipe supports; transparent plastic panels for building construction purposes; transparent plastic panels for building purposes; transparent plastic roof tiles; aggregate materials for use in concrete; concrete; building elements of concrete namely composite blocks, boards, panels, pipe supports; concrete building elements namely composite blocks, boards, panels, pipe supports; concrete building materials namely composite blocks, boards, panels, pipe supports; concrete panels namely composite blocks, boards, panels, pipe supports; concrete piles; concrete pipes; polymer concrete; reinforced concrete; synthetic concrete; trench drains in the nature of concrete drainage structures; non-metal composite structures in the nature of storm manholes, trench drains and masts; movable partitions of non-metal materials; moveable walls made of non-metallic materials; non-metal cladding panels for walls; non-metal wall panels; wall panels not of metal; plastic wallboards; fibre cement; spacers being building elements made of fibre reinforced cement; adhesive mortar for building purposes; levelling preparations in the nature of cement or mortar; non-metal ties for use in building; non-metal ties for retaining insulation between the internal and external walls of buildings; non-metallic ceiling tiles having sound insulation properties; insulation glass for building; non-metallic fabrics for the reinforcement of roofs; reinforcement rods, not of metal; non-metal structural reinforcement for construction purposes; parts and fittings for the aforesaid goods.ACTIVE—
040Treatment of geopolymer material through low temperature chemical reactions which consolidate materials and form robust bodies with high strength and chemical stability; material composition and material formulation advisory and consultancy services; treatment of hazardous waste and hazardous waste by encapsulation; treatment of nuclear waste by encapsulation; treatment of sludges, oils, swarf, graphite and ion exchange media by encapsulation; treatment of materials with the use of ion exchange media in encapsulation; advisory, consultancy and information services relating to all the aforesaid.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 7, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 29, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 26, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 3, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 3, 2025FIMPFINAL DISPOSITION PROCESSED—
Apr 7, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 8, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 22, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 22, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 7, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 7, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 17, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 17, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 28, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 15, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 15, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Aug 15, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 15, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 15, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 30, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 30, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2024RFNTREFUSAL PROCESSED BY IB—
Mar 7, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 7, 2024RFRRREFUSAL PROCESSED BY MPU—
Feb 15, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 14, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 2, 2024DOCKASSIGNED TO EXAMINER—
Sep 18, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 18, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 18, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 18, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Sep 18, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 29, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 25, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 24, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—