Drawing for EVOZERO

USPTO serial 79377330

EVOZERO

Reviewed by CopyMark Law Group

Reg. 8006915Status 700Registered
Filing date
Status date
Registration date
Nov 4, 2025
Examiner
LATTUCA, FRANK J
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with EVOZERO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John W. McGlynn

John W. McGlynn Buchanan Ingersoll & Rooney, P.C.2200 Renaissance BoulevardSuite 350King of Prussia, PA 19406

Goods and services

ClassDescriptionStatusFirst use
001Chemicals and chemical preparations for use in construction for hardening concrete, cement, asphalt, and stabilizing soil and sand; chemical additives for manufacturing and hardening concrete, cement, and asphalt, and stabilizing soil and sand; chemicals being additives for cement, concrete and other cementitious construction materials for manufacturing and hardening concrete, cement, and asphalt, and stabilizing soil and sandACTIVE—
009Downloadable and recorded Computer software for management, monitoring and control of facilities and machines for the mining, manufacture and use of cement, aggregates, ready-mixed concrete, and asphalt; downloadable and recorded application software for management, monitoring and control of facilities and machines for the mining, manufacture and use of cement, aggregates, ready-mixed concrete, and asphalt; downloadable and recorded artificial intelligence and machine learning software for management, monitoring and control of facilities and machines for the mining, manufacture and use of cement, aggregates, ready-mixed concrete, and asphalt; downloadable and recorded computer software for monitoring, analyzing, controlling and running physical world operations; downloadable and recorded computer operating system software and computer operating system support software and firmware; downloadable and recorded virtual and augmented reality software for management, monitoring and control of facilities and machines for the mining, manufacture and use of cement, aggregates, ready-mixed concrete, and asphalt; downloadable and recorded web applications for management, monitoring and control of facilities and machines for the mining, manufacture and use of cement, aggregates, ready-mixed concrete, and asphalt; downloadable and recorded server operating softwareACTIVE—
019Building and construction materials and elements, not of metal, namely, concrete pipes, concrete boxes, concrete vaults, precast concrete wall forms, non-metal catch basins for attachment to sewer pipes to trap debris; concrete; cement; aggregate materials for use in concrete, namely, sand, gravel, stone chips, crushed stone, and stones; cement aggregates; asphaltACTIVE—
035Retail store services featuring building and construction materials; Wholesale store services featuring building and construction materials; professional business consultancy services relating to the purchase and sale of building and construction materialsACTIVE—
037Building and construction services; Repair and maintenance of buildings; Repair and maintenance of roads; Property development services, namely, development of real property, in particular, repair, improvement, and new constructionACTIVE—
039Transport and delivery of building and construction materials; Storage services, namely, storage of goods; Waste collection, namely, collection of domestic and industrial waste and trash; Removal of waste, namely, transport and storage of wasteACTIVE—
040Recycling of waste and trash; treatment of waste and trash; destruction of waste and trash; incineration of waste and trashACTIVE—
042Chemical laboratories; technological consultation services relating to construction materials, building materials and construction services; chemistry services, namely, research in the field of chemistry and chemistry consultation; engineering services, namely, engineering for the construction industry; IT consulting services relating to the development, programming and implementation of software, hosting services and software as a service (SaaS) and rental of software, data duplication and data conversion services, and data coding servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 16, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 12, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 12, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Feb 4, 2026FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 20, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 4, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Nov 4, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 16, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 16, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 10, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 13, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 13, 2025XAECEXAMINER'S AMENDMENT ENTERED—
Aug 13, 2025GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 13, 2025GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 13, 2025CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 15, 2025RFNPREFUSAL PROCESSED BY IB—
Feb 14, 2025CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 13, 2025ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 22, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 22, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 29, 2024PBSRWITHDRAWN FROM PUB - SENIOR ATTORNEY REQUEST—
Oct 6, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 2, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 2, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 2, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 8, 2024RFNTREFUSAL PROCESSED BY IB—
Apr 12, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 12, 2024RFRRREFUSAL PROCESSED BY MPU—
Mar 26, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 25, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 24, 2024DOCKASSIGNED TO EXAMINER—
Mar 22, 2024DCPNCHANGE OF OWNER RECEIVED FROM IB—
Aug 29, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 25, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 24, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance