Drawing for ZEREMIS RC

USPTO serial 79377974

ZEREMIS RC

Reviewed by CopyMark Law Group

Reg. 7464710Status 700Registered
Filing date
Status date
Registration date
Aug 6, 2024
Examiner
COGAN, BRITTNEY LORRAINE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with ZEREMIS RC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Anthony P. Venturino

Anthony P. Venturino VORYS, SATER, SEYMOUR AND PEASE LLPIPLAW@VORYS - PO BOX 2255COLUMBUS, OH 43216-2255United States

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal for building purposes, namely, roofs, walls, floors; brazing alloys; cladding of metal for construction and building; metal rails; reinforcing materials of metal for building; metal cans; metal beverage cans; steel alloys unwrought or semi-wrought; steel alloys; steel sheets; galvanized steel sheets; zinc-coated steel sheets; polymer coated steels; aluminum coated steels; aluminum-silicon coated steels; steel building frames; steel drums, sold empty; sheet metal and steel plates for building; metal hardware in the nature of nuts, bolts, screws; metal shelter structures; metal profiles made of steel; metal tubes; transportable buildings of metal; wires, non-electric, of common metal; welding steel rods; plated steels; modular metal structures with flexible covers for agricultural, commercial or industrial storage; metallic containers for storage; molds of metal for cornices; common metals, unwrought or semi-wrought; pipes and tubes of metal; metallic moulds for metal casting; shutters of metalACTIVE—
017Acoustic insulating panels; acoustic insulating panels made from non-metallic materials; acoustical insulation barrier panels; composite panels having insulating properties being structural insulated construction panels; fire resistant insulated panels, namely, fire resistant composite panels made of aramid, glass, carbon or ceramic fibers; polyurethane foam for use as heat insulation; heat resistant fabrics in the nature of radiant heat resistant film to be applied to automotive and marine parts; insulating material; insulating materials for insulation against heat; insulating materials made of polyurethane foam; insulating plates being insulating materials; pipe gaskets; packing materials of rubber or plasticsACTIVE—
019Building panels, not of metal; ceiling panels, not of metal; cladding panels, non-metallic, for walls; fireproof panels for use in building, non-metallic; fire protection doors, non-metallic, for use in building; multilayer panels of plastic for use in building; wall panels, non-metallic; non-metal floor panels; cladding panels, non-metallic, for building; non-metal roofing panels; wall panels not of metalACTIVE—
040Nickel plating; electroplating; zinc plating; aluminum plating; aluminum-silicon plating; metal plating; metal treating; metal tempering; metal coating, namely, applying decorative and protective coatings to metal by means of galvanization; metal casting; heat treatment and coating of steel sheets; heat treatment and coating of steel plates; heat treatment and coating of steel strips; metal laminating; laminating of steel; laminating of metal; galvanising of metal; cutting of metal plates; cutting of metal sheets; cutting of metal stripsACTIVE—
042Technological planning services, namely, programming of computers; scientific and technological services, namely, scientific research; research in the field of materials science; engineering consultancy servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 6, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Aug 6, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 21, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 21, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 1, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 16, 2024RFNTREFUSAL PROCESSED BY IB—
Apr 14, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 13, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 13, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 13, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 26, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 26, 2024RFRRREFUSAL PROCESSED BY MPU—
Mar 7, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 6, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 5, 2024DOCKASSIGNED TO EXAMINER—
Sep 12, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 8, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 7, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance