USPTO serial 79379469
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stepehen P. McNamara
Stepehen P. McNamara St. Onge Steward Johnston & Reens LLC857 Post Road, Ste 398Fairfield, CT 06824-6041United States| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Furnaces for melting metals; melting furnaces for industrial purposes; furnaces for reducing iron ores; melting furnaces for manufacturing reduced irons; heating furnaces for industrial purposes; industrial furnaces; garbage incinerators for industrial purposes; refractory furnaces; blast furnaces; nuclear reactors; incinerators; coke furnaces; combined heating and air-conditioning apparatus; air conditioning apparatus for industrial use; air conditioning apparatus for commercial buildings; water purification apparatus; industrial waste water purification plants; solar energy receivers; industrial boilers for power plants | ACTIVE | — |
| 037 | Maintenance of manufacturing facilities for reduced irons; maintenance of fluidized bed reduction reactors for iron oxides; maintenance of cleaning facilities for gases generated from furnaces; maintenance of manufacturing facilities for melted pig irons; maintenance of furnaces and ancillary fluidized beds, compactors, driers, steam reformers, and compressors, for manufacturing iron and steel; repair of manufacturing facilities for reduced irons; repair of fluidized bed reduction reactors for iron oxides; repair of cleaning facilities for gases generated from furnaces; repair of manufacturing facilities for melted pig irons; repair of furnaces and ancillary fluidized beds, compactors, driers, steam reformers, and compressors for manufacturing iron and steel; installation of manufacturing facilities for reduced irons; installation of fluidized bed reduction reactors for iron oxides; installation of cleaning facilities for gases generated from furnaces; installation of manufacturing facilities for melted pig irons; installation of furnaces and ancillary fluidized beds, compactors, driers, steam reformers, and compressors for manufacturing iron and steel; furnace installation and repair; installation of industrial furnaces; blast furnaces installation | ACTIVE | — |
| 042 | Design of manufacturing facilities for reduced irons; design of fluidized bed reduction reactors and ancillary fluidized beds, compactors, driers, steam reformers, and compressors, for manufacturing iron and steel from iron oxides; design of cleaning facilities for gases generated from furnaces; design of manufacturing facilities for melted pig irons; design of steelworks furnaces and steelworks furnace manufacturing facilities; engineering consulting services relating to iron and steel forming systems; scientific research relating to metals; engineering consulting services relating to iron briquette and pellet handling systems; technology evaluation of steel making machinery and equipment of others to determine conformity with certification standards in the field of steel making machinery and equipment; scientific research in the field of welding; electrical engineering services; engineering surveying | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 15, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 14, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 27, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 27, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 22, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 21, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 4, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 3, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Sep 3, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 28, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 1, 2024 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 19, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 19, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jun 19, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 19, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 18, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 18, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 14, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 13, 2024 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 12, 2024 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 29, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 16, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 16, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 16, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 16, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 1, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 1, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 1, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 27, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 26, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 26, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 26, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 4, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 4, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 9, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 8, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 6, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 3, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 29, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 28, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |