USPTO serial 79379927
Reviewed by CopyMark Law Group
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
TR
Other trademarks owned by GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
TR
Other trademarks owned by GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
TR
Other trademarks owned by GÜROK TURIZM VE MADENCILIK ANONIM SIRKETI
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael F. Swartz
Michael F. Swartz Egbert, McDaniel & Swartz, PLLC1001 Texas Ave., Suite 1250Houston, TX 77002United States| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Electrical energy; electrical energy from solar power; electrical energy from renewable sources; electrical energy from wind power; electrical energy from geothermal power | ACTIVE | — |
| 009 | Electric wire and cable; electronic devices for measuring electric current; components for electrical mains in the nature of electric wires, connectors, circuit breakers, cables; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; electronic devices, namely, energy meters for tracking and monitoring energy usage; apparatus for converting thermal energy to electrical energy, namely, thermoelectric converters; electrical energy utilization metering devices; electric control devices for energy management; electricity router for managing and optimizing energy loads within a building; electronic devices, namely, handhelds for exchanging data in energy meters or submeters; electronic devices, namely, radio frequency repeaters used in long range communication for tracking and monitoring energy usage | ACTIVE | — |
| 011 | Energy storage plants; energy recovery ventilators; radiators, electric | ACTIVE | — |
| 037 | Installation of renewable energy generation equipment; maintenance and repair of energy generating installations; construction of energy and power generating installations being dams; hydro-electric factory construction; electric appliance installation and repair; repair services for electric generators and wind turbines; providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operations | ACTIVE | — |
| 039 | Distribution of energy; supplying thermal energy being distribution; distribution of renewable energy; distribution of energy for heating and cooling buildings; providing online information, news, and commentary in the field of energy distribution | ACTIVE | — |
| 040 | Energy generation services; production of energy; generation of electricity from solar energy; generation of electricity from wave energy; generation of electricity from wind energy; energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; production of electrical energy from renewable sources; recycling of electric batteries; production of energy by power plants | ACTIVE | — |
| 042 | Design of power conversion devices for converting wind energy to electrical energy; research and development in the field of hydroelectric energy; metering and monitoring electric power consumption by third parties for electric power providers; energy auditing services relating to electricity; creation of control programs for electric operation control and drive modules; technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipment | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 22, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 4, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 4, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jan 25, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 13, 2024 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Dec 13, 2024 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Sep 26, 2024 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 25, 2024 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Jun 25, 2024 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 9, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 9, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 20, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 4, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 23, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 23, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 23, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 14, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 24, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 24, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 6, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 5, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 3, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 10, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 6, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 5, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |