USPTO serial 79380453
Q-TAINER
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 25, 2025
- Examiner
- JOHNSON, BRITTANY S
- Law office
- FILE REPOSITORY (FRANCONIA)
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with Q-TAINER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Donald Ersler
1165 Terrace DriveElm Grove, WI 53122United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction of railway infrastructure, buildings, roads, tunnels, power plants and buildings for civil infrastructure projects; construction project management services; building construction supervision; construction of railways; track construction; construction of slab tracks for railways; installation services and repair of railway infrastructure, ballasted track and slab tracks for railways; information, assistance, advice and consultancy services relating to the aforesaid services | ACTIVE | — |
| 038 | Telecommunication services, namely, providing wireless access to the internet to construction sites and campuses; satellite communication services, namely, providing direct communication links with construction sites via satellite; electronic transmission and transfer of data and information; information, advice and assistance relating to the aforementioned services | ACTIVE | — |
| 039 | Transport by rail and land; GPS navigation services, namely, planning of travel routes; global positioning system navigation services; information, consultancy and assistance in relation to the aforesaid services | ACTIVE | — |
| 042 | Scientific research in the field of structural and civil engineering, railway, road, and building construction; consulting services in the field of structural and civil engineering; industrial research in the field of structural and civil engineering, railway, road, and building construction and industrial design; quality control for others for projects and processes in the field of structural and civil engineering, railway, road, and building construction; design and development of computer hardware, computer facilities, computer software; technical consultancy in the field of structural and civil engineering, railway, road, and building construction; research relating to structural and civil engineering in the nature of technical data analysis services; cloud computing featuring software for use in recording, collecting, editing and processing and transmitting of measurement data, machine data and personal data, all in the fields of construction, structural engineering, railway infrastructure, quarries and opencast mining and line construction sites; information technology (IT) consulting services relating to installation, maintenance and repair of computer software for structural and civil engineering, railway, road and building construction; rental of data centre facilities, provision of data centre facilities; consultancy and research in the field of artificial intelligence; product design and development of implements, apparatus, instruments and equipment for use in the fields of data migration services, diagnosing, condition assessment, aging diagnostics, positioning and localization of people, machines and material on different types of construction sites of railway infrastructure, buildings, roads, tunnels, power plants and buildings for others; providing technical information and advice relating to the aforesaid services; structural and civil engineering. | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks in Class 037
- Other trademarks in Class 038
- Other trademarks in Class 039
- Other trademarks in Class 042
- Similar marks named Q-TAINER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 27, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 9, 2025 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 9, 2025 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 4, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 25, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 22, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 4, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 4, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 25, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Feb 25, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 7, 2025 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 7, 2025 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 1, 2025 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 10, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 29, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 27, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 27, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 29, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 29, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 29, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 13, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 8, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 8, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 8, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 27, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 19, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 19, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 19, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 2, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 1, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 10, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 6, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 5, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |