USPTO serial 79380836
GRID-ENSURE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 1, 2025
- Examiner
- FITZSIMONS, MICHAEL R
- Law office
- PETITIONS OFFICE
What this means
Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.
Need help with GRID-ENSURE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Molly Buck Richard
Molly Buck Richard Richard Law Group5910 N. Central Expressway, Suite 325Dallas, TX 75206United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Installations and equipment for power generation, namely, energy production apparatus for power stations with gas and steam turbines, other than for land vehicles, wind and hydroelectric installations in the nature wind turbines and hydroelectric generators, solar installations in the nature of solar-powered electricity generators, and components and parts for the aforementioned installations; machines and machine tools for the production and distribution of energy, namely, electrical generators and electric motors for electric generators; electricity generators; generators for wind turbines; solar-powered electricity generators; turbocompressors; pumps for machines; air compressors; wind powered electricity generators; automation systems for oil and gas installations, namely, cleaning units in the nature of cleaning machines for oil and gas pipelines | ACTIVE | — |
| 009 | Apparatus and instruments for conducting, switching, converting, storing, regulating or controlling the distribution or use of electricity and energy, namely electrical conductors, electrical switches, electric power converters, electrical accumulators, electrical capacitors, electrical resistances; photovoltaic cells for generating electricity; solar cells; circuit breakers and high-voltage, medium-voltage and low-voltage power switching installations; electrical distribution cabinets being electrical power distribution units; electric switching installations; high-voltage direct current converters; electric current rectifiers; power current inverters; control devices and apparatus for network controlling and switching, namely, gateway routers, network routers, computer network bridges, modems, wireless access points devices being computer hardware, network telecommunication cables, line drivers being motives, computer network switches, computer network hubs and wireless network repeaters; current transformers; electric cables and electric cable lines being electric cables; electronic performance measuring devices, for measuring electric current; electronic torque measuring equipment; electronic devices for measuring electric current load; downloadable and recorded computer software for computers for controlling smart grids; downloadable and recorded networking software for performing communication and networking tasks; downloadable and recorded artificial intelligence and machine learning software for controlling smart grids | ACTIVE | — |
| 037 | Installation, assembly, servicing and repair of machinery and products and equipment in the nature of computer hardware for energy production, transport and distribution; Installation, assembly, servicing and repair of machinery and computer hardware for electrical engineering; Installation, assembly, servicing and repair of machinery and computer hardware for manufacturing electronics ; Installation, assembly, servicing and repair of machinery and computer hardware for computing and mechanical construction; laying of cables; pipeline construction and maintenance; installation, servicing and maintenance of energy converters, power plants, wave energy converters and wave energy power plants; installation, construction, servicing, maintenance and maintenance of electricity and energy generating installations and equipment; installation, servicing and maintenance of solar energy installations for producing electricity; underwater construction | ACTIVE | — |
| 042 | Scientific and industrial research in the field of products, services and solutions for the energy sector; engineering services in the field of energy efficiency, namely, engineering advice with respect to energy saving; computer software development; engineering work, namely, engineering advisory services, in the nature of advice on technical safety; planning and design of energy generating installations; engineering services, namely, technical project planning and related advice in the field of electrical engineering; rental of computer equipment in the nature of computer hardware and computer software for managing electrical systems; engineering services in the field of products, services and solutions for the energy sector, with a particular focus on electrical infrastructure; engineering services in the field of electrical infrastructure for the energy sector | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Hitachi Energy Switzerland AG
- Other trademarks owned by Hitachi Energy Ltd
- Other trademarks owned by Hitachi Energy Ltd
- Other trademarks owned by Hitachi Energy Ltd
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named GRID-ENSURE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 22, 2025 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 10, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Oct 10, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Sep 11, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 11, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 11, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 11, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 1, 2025 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 1, 2025 | NRCC | NOTICE OF REGISTRATION CONFIRMATION EMAILED | — |
| Apr 1, 2025 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 29, 2025 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 17, 2025 | CHPB | POST PUBLICATION AMENDMENT - ENTERED | — |
| Mar 17, 2025 | APET | ASSIGNED TO PETITION STAFF | — |
| Mar 11, 2025 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 11, 2025 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 9, 2025 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Feb 11, 2025 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Nov 26, 2024 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Nov 1, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 29, 2024 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 29, 2024 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 9, 2024 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 23, 2024 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 22, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 22, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 22, 2024 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 2, 2024 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 2, 2024 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 2, 2024 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 24, 2024 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 23, 2024 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 23, 2024 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 16, 2024 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 29, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 26, 2024 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 26, 2024 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 5, 2024 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 4, 2024 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2024 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 9, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Oct 17, 2023 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 13, 2023 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 12, 2023 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |