Drawing for GRID-ENSURE

USPTO serial 79380836

GRID-ENSURE

Reviewed by CopyMark Law Group

Reg. 7741428Status 700Registered
Filing date
Status date
Registration date
Apr 1, 2025
Examiner
FITZSIMONS, MICHAEL R
Law office
PETITIONS OFFICE

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GRID-ENSURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Molly Buck Richard

Molly Buck Richard Richard Law Group5910 N. Central Expressway, Suite 325Dallas, TX 75206United States

Goods and services

ClassDescriptionStatusFirst use
007Installations and equipment for power generation, namely, energy production apparatus for power stations with gas and steam turbines, other than for land vehicles, wind and hydroelectric installations in the nature wind turbines and hydroelectric generators, solar installations in the nature of solar-powered electricity generators, and components and parts for the aforementioned installations; machines and machine tools for the production and distribution of energy, namely, electrical generators and electric motors for electric generators; electricity generators; generators for wind turbines; solar-powered electricity generators; turbocompressors; pumps for machines; air compressors; wind powered electricity generators; automation systems for oil and gas installations, namely, cleaning units in the nature of cleaning machines for oil and gas pipelinesACTIVE—
009Apparatus and instruments for conducting, switching, converting, storing, regulating or controlling the distribution or use of electricity and energy, namely electrical conductors, electrical switches, electric power converters, electrical accumulators, electrical capacitors, electrical resistances; photovoltaic cells for generating electricity; solar cells; circuit breakers and high-voltage, medium-voltage and low-voltage power switching installations; electrical distribution cabinets being electrical power distribution units; electric switching installations; high-voltage direct current converters; electric current rectifiers; power current inverters; control devices and apparatus for network controlling and switching, namely, gateway routers, network routers, computer network bridges, modems, wireless access points devices being computer hardware, network telecommunication cables, line drivers being motives, computer network switches, computer network hubs and wireless network repeaters; current transformers; electric cables and electric cable lines being electric cables; electronic performance measuring devices, for measuring electric current; electronic torque measuring equipment; electronic devices for measuring electric current load; downloadable and recorded computer software for computers for controlling smart grids; downloadable and recorded networking software for performing communication and networking tasks; downloadable and recorded artificial intelligence and machine learning software for controlling smart gridsACTIVE—
037Installation, assembly, servicing and repair of machinery and products and equipment in the nature of computer hardware for energy production, transport and distribution; Installation, assembly, servicing and repair of machinery and computer hardware for electrical engineering; Installation, assembly, servicing and repair of machinery and computer hardware for manufacturing electronics ; Installation, assembly, servicing and repair of machinery and computer hardware for computing and mechanical construction; laying of cables; pipeline construction and maintenance; installation, servicing and maintenance of energy converters, power plants, wave energy converters and wave energy power plants; installation, construction, servicing, maintenance and maintenance of electricity and energy generating installations and equipment; installation, servicing and maintenance of solar energy installations for producing electricity; underwater constructionACTIVE—
042Scientific and industrial research in the field of products, services and solutions for the energy sector; engineering services in the field of energy efficiency, namely, engineering advice with respect to energy saving; computer software development; engineering work, namely, engineering advisory services, in the nature of advice on technical safety; planning and design of energy generating installations; engineering services, namely, technical project planning and related advice in the field of electrical engineering; rental of computer equipment in the nature of computer hardware and computer software for managing electrical systems; engineering services in the field of products, services and solutions for the energy sector, with a particular focus on electrical infrastructure; engineering services in the field of electrical infrastructure for the energy sectorACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 22, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 10, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Oct 10, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 11, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 11, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 11, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 11, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 11, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 11, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 1, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 1, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Apr 1, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 29, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 17, 2025CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Mar 17, 2025APETASSIGNED TO PETITION STAFF—
Mar 11, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 11, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 9, 2025ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Feb 11, 2025EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Nov 26, 2024ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Nov 1, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 29, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 29, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 9, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 23, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 22, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 22, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 22, 2024ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 2, 2024GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 2, 2024GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 2, 2024CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 24, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 23, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 23, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 16, 2024RFNTREFUSAL PROCESSED BY IB—
Mar 29, 2024DOCKASSIGNED TO EXAMINER—
Mar 26, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 26, 2024RFRRREFUSAL PROCESSED BY MPU—
Mar 5, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 4, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2024DOCKASSIGNED TO EXAMINER—
Dec 9, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Oct 17, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 13, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 12, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance