Drawing for INGEROP

USPTO serial 79380972

INGEROP

Reviewed by CopyMark Law Group

Reg. 7821196Status 700Registered
Filing date
Status date
Registration date
Jun 10, 2025
Examiner
MILLER,AMANDA A
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with INGEROP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas J. Mango

Thomas J. Mango CANTOR COLBURN LLP20 Church St, 22nd Floor2 rue Sarah Bernhardt,Hartford, CT 06103-1221

Goods and services

ClassDescriptionStatusFirst use
037Services of construction of civil engineering structures; building construction and repair; repairs and installation of tunnels, roadways, highways, bridges, airports, seaports, water treatment and sanitation infrastructure, dams, canals, locks, railways, tramways, factories, energy production plants; information services in the field of construction and project management of construction worksACTIVE—
042Professional engineering consulting services in matters of construction and unrelated to business dealings; engineering services, namely, civil engineering services relating to buildings, tunnels, roadways, highways, bridges, airports, seaports, water treatment and sanitation infrastructure, dams, canals, locks, railways, tramways, factories, energy production plants; engineering project studies, namely, conducting feasibility studies in the field of environmental engineering; construction drafting consulting; providing advice in the field of engineering, in particular relating to the construction of tunnels, roadways, highways, bridges, airports, seaports, water treatment and sanitation infrastructure, dams, canals, locks, railways, tramways, factories, energy production plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 29, 2026FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 9, 2026FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 8, 2026FIMPFINAL DISPOSITION PROCESSED—
Nov 7, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 10, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 10, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 10, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 22, 2025NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 22, 2025PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 16, 2025NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 29, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 25, 2025CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 11, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 11, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 5, 2025TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 5, 2025CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 5, 2025TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 19, 2024GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 19, 2024GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 19, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 15, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 15, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 15, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 17, 2024RFNTREFUSAL PROCESSED BY IB—
May 24, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 24, 2024RFRRREFUSAL PROCESSED BY MPU—
May 15, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 14, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2024DOCKASSIGNED TO EXAMINER—
Oct 20, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 16, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 12, 2023SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance