Drawing for POLHUS

USPTO serial 79380998

POLHUS

Reviewed by CopyMark Law Group

Reg. 7691220Status 700Registered
Filing date
Status date
Registration date
Feb 18, 2025
Examiner
KLEINMAN, CORINNE ANNE
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with POLHUS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rhett V. Barney

Rhett V. Barney LEE & HAYES, PC601 W. RIVERSIDE AVE SUITE 1400SPOKANE, WA 99201United States

Goods and services

ClassDescriptionStatusFirst use
006Pre-fabricated houses of metal; Kits, namely, prefabricated houses of metal; metal gazebos; gazebos primarily of metal; portable buildings of metal for housing toilets; greenhouses of metal, transportable; metal greenhouses; greenhouses being fixed metal structures; portable mobile metal office buildings; buildings, transportable, of metal; transportable houses of metal; transportable greenhouses of metal for household use; pre-fabricated metal building assembly kits; prefabricated buildings made substantially of metal; nails; roofing sheets of metal; Ceilings of metal, namely, metal ceiling panels and tilesACTIVE—
009Solar panels for production of electricity; Photovoltaic apparatus and installations, namely, solar modules and solar panels for generating solar electricityACTIVE—
011Steam baths installations, saunas and spas in the nature of heated pools; Spa in the nature of heated pools; bath tubs; hot tubs; bath installations; sauna bath installations; Sauna heater rocks; sauna heaters; Sauna apparatus in the nature of saunas; saunas; bath screens; toilets being water-closets; toilets, portable; fitted spa coversACTIVE—
017Thermal insulation articles and material, not for buildings; insulating materials for use with floor coveringsACTIVE—
019Kits, namely, prefabricated houses, not  of metal; Structures and transportable buildings, not of metal, namely, prefabricated and modular non-metal garden houses, prefabricated non-metal vacation homes, non-metal transportable and modular greenhouses, non-metal prefabricated garages, gazebos not primarily of metal, and sheds not of metal; prefabricated non-metal buildings; prefabricated, non-metal storage sheds; prefabricated houses being kits of wood; wainscotting, not of metal; prefabricated non-metal walls; prefabricated soundproof cabins, not of metal; prefabricated building elements for on site assembly, namely, non-metallic pre-fabricated building assembly kits; modular units for constructing prefabricated buildings, namely, non-metallic pre-fabricated building assembly kits; modular log homes; modular homes, not of metal; portable cabins not of metal; buildings, transportable, not of metal; non-metallic structures, namely, gazebos not primarily of metal; portable gazebos not primarily of metal; portable non-metallic buildings incorporating toilet facilities; transportable non-metallic buildings for housing portable toilets; prefabricated non-metallic structures for use as toilets; pre-fabricated greenhouses, not of metal; greenhouses, transportable, not of metal; modular greenhouses, not of metal; greenhouse frames, not of metal; non-metal transportable greenhouses for household use; felt roof coverings; non-metallic roofing boards having insulating properties; roofing tiles, not of metal; ceilings, not of metal; doors, not of metal; non-metallic portable rooms in the nature of non-metal portable buildingsACTIVE—
028Playhouses for children; slides being playground equipment; building gamesACTIVE—
035Retail store services featuring steam baths, sauna bath installations and spa baths, spas in the nature of heated swimming pools, spa pools, baths, hot tubs, bath plumbing fixtures, sauna installations, sauna stones, sauna heaters, sauna apparatus in the nature of saunas, saunas, panels for bathtubs, toilets in the nature of water closets, toiletries, toilets, portable, fitted spa covers, purification plants, filtering installations for water, roof battens, not of metal for use with containers, electric light tubes, sauna ladles, spark-guards screening, cover plates of metal, self-adhesive tapes, steel chimneys, electronic control units, water heaters, windows, not of metal for use with containers, steam generators for use with steam baths, shower mats, non-metal wainscotting, insulating foils, thermometers, furniture in the nature of benches, insulation in the form of floor coverings, electrical fans, thermal insulating articles, materials for thermal insulation, roofing sheets, not of metal for use with containers, roofing sheets of metal, solar panels, photovoltaic apparatus and facilities for generating solar energy, play houses for children, slides being playground equipment, building games, prefabricated houses kits, structures and transportable buildings, not of metal for use with containers, prefabricated buildings, not of metal, prefabricated storage sheds, not of metal for use with containers, prefabricated houses kits of wood, non-metal wainscotting, prefabricated walling, not of metal for use with containers, prefabricated soundproof cabins, not of metal for use with containers, prefabricated buildings elements, not of metal, for onsite assembly, non-metallic modular units for constructing prefabricated buildings, modular log houses, modular houses, not of metal for use with containers, portable cabins, not of metal for use with containers, non-metallic transportable buildings, structures not of metal, namely, garden pavilions, portable gazebos, not primarily of metal, portable buildings containing toilet facilities, not of metal for use with containers, non-metallic buildings for housing portable toilets, non-metallic prefabricated structures for use as toilets, prefabricated greenhouses, not of metal for use with containers, portable greenhouses, not of metal for use with containers, modular greenhouses, not of metal for use with containers, frames for greenhouses, not of metal for use with containers, transportable greenhouses for household use, not of metal for use with containers, roof coverings of roofing felt, roofing boards, not of metal, having insulating properties, ceiling, not of metal for use with containers, doors, not of metal for use with containers, and non-metallic portable roomsACTIVE—
037Erection of pre-fabricated buildings; assembly of prefabricated houses; construction services, namely, construction of garden houses, outdoor saunas, vacation homes, greenhouses, garages, gazebos, and sheds; construction consultancy; house building; construction works for prefabricated houses; construction, namely, construction of garden houses, outdoor saunas, vacation homes, greenhouses, garages, gazebos, and shedsACTIVE—
042Construction draftingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 19, 2025FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 31, 2025FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 31, 2025FIMPFINAL DISPOSITION PROCESSED—
May 18, 2025FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 29, 2025OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 11, 2025OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 11, 2025OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 18, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Feb 18, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 31, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 31, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 25, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 5, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 5, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Dec 5, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 5, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 5, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 17, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 17, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 17, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 11, 2024RFNTREFUSAL PROCESSED BY IB—
May 23, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 23, 2024RFRRREFUSAL PROCESSED BY MPU—
May 11, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 10, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 8, 2024DOCKASSIGNED TO EXAMINER—
Nov 25, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 20, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 16, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 12, 2023SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance