Drawing for RCTECH

USPTO serial 79381298

RCTECH

Reviewed by CopyMark Law Group

Reg. 7656442Status 700Registered
Filing date
Status date
Registration date
Jan 21, 2025
Examiner
MANCA, ALBERTO I
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with RCTECH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

EUNJEONG JI

EUNJEONG JI BROADVIEW IP LAW, PC3200 El Camino Real, Suite 260Irvine, CA 92602United States

Goods and services

ClassDescriptionStatusFirst use
007Semi-conductor substrates manufacturing machines; vacuum chambers for processing semiconductor substances being replacement parts for semiconductor manufacturing machines; sprays for fluid dispensers being replacement parts for semiconductor wafer processing machines; semiconductor wafer processing machines; semiconductor wafer processing equipment; laser cutting machines for manufacturing semiconductors; machines for the production and processing of films, namely, multipolar sputtering machines used for depositing thin films used for manufacturing LCD panels, plasma display panel, semiconductor wafers, solar cells and LED panels; machines for the production and processing of films, namely, ion beam sputter evaporation machines used for depositing thin films for manufacturing LCD panels, plasma display panel, semiconductor wafers, solar cells and LED panels; vacuum pumps; gas distributing plate being replacement parts for semiconductor manufacturing machines; machines for manufacturing semiconductors; semiconductor wafer processing machines, namely, semiconductor wafer washing equipment; semiconductor manufacturing machines; laser evaporation and sublimation apparatus being replacement parts for machines for manufacturing LCD panels, plasma display panel, semiconductor wafers, solar cells and LED panels; vapor deposition apparatus being replacement parts for semiconductor wafer processing machines; valves being parts of machines; valves bring parts of pumps; valves other than for land vehicles being parts of machinesACTIVE—
037Repair of semiconductor processing machines for fabricating semiconductor devices; maintenance of semiconductor processing machines for fabricating semiconductor devices; maintenance of semiconductor and crystalline liquid manufacturing machines; repair of semiconductor and crystalline liquid manufacturing machines; repair of semiconductor manufacturing equipment; installation of semiconductor processing machines for fabricating semiconductor devices; repair and maintenance of semiconductor manufacturing equipment; providing information relating to the repair and maintenance of semi-conductor manufacturing machines and systems; repair and maintenance of semi-conductor manufacturing machines and systems and providing repair and maintenance information relating thereto; repair and maintenance of semi-conductor manufacturing machines and systems; repair and maintenance of machines and systems for manufacturing semiconductors; repair and maintenance of semiconductor manufacturing machines and systems; maintenance of semiconductor manufacturing equipment; repair of light emitting diode (LED) manufacturing apparatus; maintenance of light emitting diode(LED) manufacturing apparatus; installation, maintenance, and repair of LCD panels; installation, maintenance and repair of compressors, air pumps and vacuum pumps; reconditioning of vacuum pumps and parts thereof; consultancy and advisory services relating to the repair and maintenance of vacuum pumps and parts thereof; repair and maintenance of vacuum pumps and parts thereofACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 21, 2025NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jan 21, 2025R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 3, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 3, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 27, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 4, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 4, 2024XAECEXAMINER'S AMENDMENT ENTERED—
Nov 4, 2024GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 4, 2024GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 4, 2024CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 4, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 4, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 4, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 30, 2024RFNTREFUSAL PROCESSED BY IB—
Apr 5, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 5, 2024RFRRREFUSAL PROCESSED BY MPU—
Mar 19, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 18, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2024DOCKASSIGNED TO EXAMINER—
Oct 31, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 25, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 19, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance