Drawing for GÜROK-GES

USPTO serial 79381366

GÜROK-GES

Reviewed by CopyMark Law Group

Reg. 7424170Status 700Registered
Filing date
Status date
Registration date
Jun 25, 2024
Examiner
HUSSAIN, TASNEEM
Law office
FILE REPOSITORY (FRANCONIA)

What this means

Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six. Calendar Section 8 between years five and six, and consider trademark monitoring.

Status 700: Status 700 means the trademark is registered and active on the Principal Register. You have nationwide rights for the listed goods and services and may use ®. Section 8 maintenance is due between years five and six.

Need help with GÜROK-GES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael F. Swartz

Michael F. Swartz Egbert, McDaniel & Swartz, PLLC1001 Texas Ave., Suite 1250Houston, TX 77002UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
004Electrical energy; electrical energy from solar power; electrical energy from renewable sources; electrical energy from wind power; electrical energy from geothermal powerACTIVE—
009Electric wire and cable; electronic devices for measuring electric current; components for electrical mains in the nature of electric wires, connectors, circuit breakers, cables; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling the distribution or use of electric current; electronic devices, namely, energy meters for tracking and monitoring energy usage; apparatus for converting thermal energy to electrical energy, namely, thermoelectric converters; electrical energy utilization metering devices; electric control devices for energy management; electricity router for managing and optimizing energy loads within a building; electronic devices, namely, handhelds for exchanging data in energy meters or submeters; electronic devices, namely, radio frequency repeaters used in long range communication for tracking and monitoring energy usageACTIVE—
011Energy storage plants; energy recovery ventilators; radiators, electricACTIVE—
037Installation of renewable energy generation equipment; maintenance and repair of energy generating installations; construction of energy and power generating installations being dams; hydro-electric factory construction; electric appliance installation and repair; repair services for electric generators and wind turbines; providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operationsACTIVE—
039Distribution of energy; supplying thermal energy being distribution; distribution of renewable energy; distribution of energy for heating and cooling buildings; providing online information in the field of energy distributionACTIVE—
040Energy generation services; production of energy; generation of electricity from solar energy; generation of electricity from wave energy; generation of electricity from wind energy; energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; production of electrical energy from renewable sources; recycling of electric batteries; production of energy by power plantsACTIVE—
042Design of power conversion devices for converting wind energy to electrical energy; research and development in the field of hydroelectric energy; metering and monitoring electric power consumption by third parties for electric power providers; energy auditing services relating to electricity; creation of control programs for electric operation control and drive modules; technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency of such equipmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 25, 2024NRCCNOTICE OF REGISTRATION CONFIRMATION EMAILED—
Jun 25, 2024R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 9, 2024NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 9, 2024PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 20, 2024NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 4, 2024CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 14, 2024RFNTREFUSAL PROCESSED BY IB—
Feb 10, 2024TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 10, 2024CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 10, 2024TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 24, 2024RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 24, 2024RFRRREFUSAL PROCESSED BY MPU—
Jan 6, 2024RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 5, 2024CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2024DOCKASSIGNED TO EXAMINER—
Oct 24, 2023MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 20, 2023NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 19, 2023REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance